Powering down/up applications (examples)
Servicing the Network Management Module – 188
•
•
•
4.3.3.2 Step 1: Installation setup
4.3.3.2.1 Objective
Use load segmentation provided by the UPS to independently control the power supply of each IT equipment categories
(Applications, Database servers, Storage).
This will allow to restart sequentially the IT equipment on utility recovery.
4.3.3.2.2 Resulting setup
UPS provides outlets (Group 1 and Group 2) and a primary output.
Connections to UPS can be done as described below:
Group 1: Applications
Group 2: Database servers
Primary: Storage
4.3.3.3 Step 2: Power outage policy settings
4.3.3.3.1 Objective
Use load segment restart settings to define restart sequencing.
4.3.3.3.2 Resulting setup
1. Navigate to
Contextual help>>>Protection>>>Shutdown on power outage
page and to the When utility comes back section.
When utility recovers, primary starts immediately.
Содержание Network-M3
Страница 1: ...UPS Network Management Card Network M3 User s Guide English 10 27 2023...
Страница 2: ......
Страница 10: ...Table of Contents 10 Applicable product Eaton UPS ATS...
Страница 32: ...Home Contextual help of the web interface 32 3 2 7 1 3 Battery mode 3 2 7 1 4 Off mode...
Страница 34: ...Home Contextual help of the web interface 34 3 2 7 2 3 Battery mode 3 2 7 2 4 Off mode...
Страница 36: ...Home Contextual help of the web interface 36 3 2 7 3 2 Bypass mode 3 2 7 3 3 Battery mode...
Страница 37: ...Home Contextual help of the web interface 37 3 2 7 3 4 HE mode ESS mode 3 2 7 3 5 Maintenance bypass mode...
Страница 63: ...Protection Contextual help of the web interface 63 Example 2 Immediate OFF...
Страница 64: ...Protection Contextual help of the web interface 64 Example 4 Custom Settings 1...
Страница 120: ...Settings Contextual help of the web interface 120 3 7 6 3 SSH 3 7 6 4 SNMP 3 7 6 5 MQTT...
Страница 287: ...Acronyms and abbreviations Information 287...
Страница 294: ......