Contextual help of the web interface – 147
•
•
•
•
•
•
•
•
•
•
•
•
Possible cause
The IPP/IPM certificate is not yet valid for the Network Module.
Certificates of IPP/IPM and the Network Module are not matching so that authentication and encryption of connections
between the Network Module and the shutdown agents is not working.
Setup
IPP/IPM is started.
Network module is connected to the UPS and to the network.
Action #1
Check if the IPP/IPM certificate validity for the Network Module.
STEP 1: Connect to the Network Module
On a network computer, launch a supported web browser. The browser window appears.
In the Address/Location field, enter: https://xxx.xxx.xxx.xxx/ where xxx.xxx.xxx.xxx is the static IP address of the
Network Module.
The log in screen appears.
Enter the user name in the User Name field.
Enter the password in the Password field.
Click Login. The Network Module web interface appears.
STEP 2: Navigate to Settings/Certificates page
STEP 3: In the Trusted remote certificates section, check the status of the Protected applications (MQTT).
If it is "Valid" go to Action#2 STEP 2, if it is "Not yet valid", time of the need to be synchronized with IPP/IPM .
STEP 4: Synchronize the time of the Network Module with IPP/IPM and check that the status of the Protected applications
(MQTT) is now valid.
Communication will then recover, if not go to Action#2 STEP 2.
Action #2
Pair agent to the Network Module with automatic acceptance (recommended in case the installation is done in a secure and
trusted network).
STEP 1: Connect to the Network Module.
On a network computer, launch a supported web browser. The browser window appears.
In the Address/Location field, enter: https://xxx.xxx.xxx.xxx/ where xxx.xxx.xxx.xxx is the static IP address of the
Network Module.
The log in screen appears.
Enter the user name in the User Name field.
Enter the password in the Password field.
Click Login. The Network Module web interface appears.
STEP 2: Navigate to Protection/Agents list page.
STEP 3: In the Pairing with shutdown agents section, select the time to accept new agents and press the Start button
and Continue. During the selected timeframe, new agent connections to the Network Module are automatically trusted and
accepted.
STEP 4: Action on the agent ( IPP/IPM ) while the time to accepts new agents is running on the Network Module
Remove
the Network
module
certificate
file(s)
*.0 that
is
(are)
located
in
the
folder
Eaton\IntelligentPowerProtector\configs\tls.
For manual pairing (maximum security), go to
Содержание Network-M3
Страница 1: ...UPS Network Management Card Network M3 User s Guide English 10 27 2023...
Страница 2: ......
Страница 10: ...Table of Contents 10 Applicable product Eaton UPS ATS...
Страница 32: ...Home Contextual help of the web interface 32 3 2 7 1 3 Battery mode 3 2 7 1 4 Off mode...
Страница 34: ...Home Contextual help of the web interface 34 3 2 7 2 3 Battery mode 3 2 7 2 4 Off mode...
Страница 36: ...Home Contextual help of the web interface 36 3 2 7 3 2 Bypass mode 3 2 7 3 3 Battery mode...
Страница 37: ...Home Contextual help of the web interface 37 3 2 7 3 4 HE mode ESS mode 3 2 7 3 5 Maintenance bypass mode...
Страница 63: ...Protection Contextual help of the web interface 63 Example 2 Immediate OFF...
Страница 64: ...Protection Contextual help of the web interface 64 Example 4 Custom Settings 1...
Страница 120: ...Settings Contextual help of the web interface 120 3 7 6 3 SSH 3 7 6 4 SNMP 3 7 6 5 MQTT...
Страница 287: ...Acronyms and abbreviations Information 287...
Страница 294: ......