9.2 Carrying out testing in light and current mode

1.  Check that the dipswitch setting positions are in accordance 

with your application.

2.  Activate the camera flash within 20 cm (8 in.) of the EAFR-01 

sensor relay and simultaneously activate the binary input BI1 

used for over-current condition.

3.  Verify that the sensor channel indication LED status is changed 

to ON.

4.  Verify that the binary input indication LED status is changed to 

ON.

5.  Verify the relay output(s) activation(s) by checking the circuit 

breaker status or by monitoring trip contact status.

ote: 

N

A best practice is to operate circuit breaker at testing.  The circuit 

breaker should open or contacts operate.

6.  Verify that the corresponding relay output(s) LED(s) indication 

status is changed to ON.

7.  If the binary output (BO1) signal is utilized, verify the BO1 signal 

activation by the status change of the relevant input where the 

binary output signal is connected, or by measuring the signal 

output voltage.

8.  If a binary output or high speed output (HSO) signal is utilized, 

verify that BO1 LED or the relevant HSO LED is illuminated.  
Note that the BO1 signal is a non-latched type.

9.  If the other binary input (BI2) is in use, verify correct operation 

by activating the input.

10.  Activate the camera flash within 20 cm (8 in.) from the EAFR-01 

sensor relay and do not activate the binary input used for over-

current condition.

11.  Verify that no trip has occurred and only the sensor activation 

indication LED is ON.

12.  Verify that the BO1 signal is activated (if in use and configured 

to send light information).

13.  Press the SET push-button to reset all indications and latches.
14.  If the binary input BI2 is utilized for master trip to activate the 

BI2, verify that a trip has occurred by repeating steps 4 and 5.

15.  Press the SET push-button to reset all indications and latches.
16.  Repeat the testing procedure for all sensors.

9.3 Testing the CBFP function

The circuit breaker failure function is tested by leaving light signal 

and second trip criteria signal (e.g. over-current), if applicable, active 

for above the set CBFP time of either 100 or 150 ms.  The trip relay 

T2 and binary output BO1 should be active after the set time delay.

9.4 Testing the arc flash protection unit operation time

The EAFR-110PLV operation time test is not required at commission-

ing as it is performed by the manufacturer as a type test and routine 

production test.  Refer to the routine test reports sent with  

EAFR-110PLV relay and consult your nearest Eaton representative for 

type test reports.
However, if it is deemed necessary, a site timing test may be 

conducted using the instructions that follow.
1.  Use a calibrated relay test set.
2.  Connect an output from the relay test set to the camera flash 

or equivalent input for initializing the flash and configure a relay 

test set timer to be started simultaneously with flash.

3.  Connect EAFR-110PLV trip output T1,T2, or high speed outputs 

HSO1 or HSO2 to relay test set input and configure the input to 

stop the timer.

4.  Place camera flash to maximum 20 cm (8 in.) distance of the 

EAFR-01.

5.  Initiate the flash and timer using the relay test set output.
6.  Read the measured time between simulated arc and trip 

contact operation.

7.  Subtract the digital input delay of the relay test set from the 

final measured time if applicable.  For specific test instructions 

consult the manufacturer of the relay test set.

Содержание EAFR-110PLV

Страница 1: ...eneral 2 3 Operation and configuration 5 4 Arc sensors 9 5 System self supervision 11 6 Connections 12 7 Wiring diagrams 13 8 Dimensions and installation 14 9 Testing 16 10 Troubleshooting guide 19 11...

Страница 2: ...uP Microprocessor 2 General The Eaton Arc Flash Relay EAFR 110PLV is a sophisticated micro processor based arc flash protection relay with combined current and arc sensing Combined current and arc se...

Страница 3: ...vice AQD for the maximum level of arc fault protection The main features of EAFR 110PLV 110 220 Vac 125 250 Vdc auxiliary power supply Three phase current inputs IL1 IL2 and IL3 1A 5A nominal One grou...

Страница 4: ...supervision Control and power supply Ig X3 12 11 10 9 8 7 6 5 4 3 2 1 1A 5A HSO1 1A 5A 1A 5A 1A 5A HSO2 T3 SW1 SW2 set x In Ig set x In Current 0 5 0 05 1 0 6 0 13 12 S1 S2 8 7 6 S3 5 4 3 S4 2 1 QD u...

Страница 5: ...ve condition If the arc sensor is activated the corresponding sensor channel LED will turn on if the activation is longer than 1 5 ms The sensor LED activation function is latched steady light To clea...

Страница 6: ...formed Also activated by pressure information Check why the sensor activated check the sensor continuity or perform system setup see Section 3 3 1 Auto configuration System setup S4 Amber Normal statu...

Страница 7: ...n previous memorized set up a dip switch anyone must be moved back and forth prior to performing auto configuration Timeout allowing new configuration is one minute Reconfiguration with more connectio...

Страница 8: ...trip criteria channel 3 in EAFR 110F Trip on light only Trip on light and over current Both signals are required simultaneously to trip 5 a b Selection of standard arc configuration type Standard arc...

Страница 9: ...as completely as possible One sensor per closed metal clad compartment should be utilized In open spaces such as the bus bar section arc sensors should be mounted maximum 2 m 6 5 ft apart The factory...

Страница 10: ...see Figure 8 Figure 8 EAFR 01 sensor connection step 2 3 Connect the other end of the cable to a sensor channel on the EAFR 101 or EAFR 110PLV relay see Figure 9 Figure 9 EAFR 01 sensor connection ste...

Страница 11: ...the ERROR LED is illuminated If a fiber sensor failure occurs the unit will go into Error mode The ERROR LED will turn on the SF relay will release and the corresponding faulty fiber sensor channel L...

Страница 12: ...gized again 6 2 Inputs 6 2 1 Current measurement inputs The EAFR 110PLV has four CT inputs for three phase current and earth current measurement Both phase current and earth current inputs may be conf...

Страница 13: ...iring diagrams Figure 17 EAFR 110PLV wiring diagram A A T2 CBFP T3 SF T1 T4 X2 1 2 13 12 11 10 9 8 7 6 X1 11 10 9 8 7 6 5 4 3 2 1 UAUX S1 S2 S3 S4 S5 Station battery _ EAFR 110PLV _ _ _ IL1 IL2 IL3 Ig...

Страница 14: ...t sensor relay user manual EATON www eaton com 8 Dimensions and installation The EAFR 110PLV is door mounted in standard 19 in 482 6 mm rack height of 4U and 1 4 of a relay wide Figure 18 EAFR 102 dim...

Страница 15: ...Figure 19 EAFR 110PLV dimensions in millimeters inches 3 D view POWER ERROR TRIP 1 TRIP 2 SEN 1 SEN 2 SEN 3 SEN 4 FIBER I IN L OUT M TRIP L1 L2 L3 Io BO1 BO2 ARC PROTECTION SET AQ 1 10 157 6 18 82 3 2...

Страница 16: ...corresponding sensor channel indication LED status is changed to ON 4 Verify the relay output s activation s by checking the circuit breaker status or by monitoring the trip contact status The circuit...

Страница 17: ...d configured to send light information 13 Press the SET push button to reset all indications and latches 14 If the binary input BI2 is utilized for master trip to activate the BI2 verify that a trip h...

Страница 18: ...s Sensor channel 1 setting Sensor channel 2 3 4 setting Circuit breaker failure protection CBFP in use yes no Object activated LED indication T1 and T2 active BO1 active Sensor channel 1 Sensor 1 Sens...

Страница 19: ...stance 10 m Power consumption of current inputs circuit 10 m 11 4 Trip relays T1 and T2 Number 3 NO 1 NC or 4 NO Rated voltage 250 Vac dc Continuous carry 5 A Make and carry for 0 5 s 30 A Make and ca...

Страница 20: ...degree back IP 20 Dimensions W x H x D mm W x H x D in 102 x 157 x 164 mm 4 02 x 6 18 x 6 46 in Package dimensions W x H x D mm in 230 x 120 x 210 mm 9 06 x 6 18 x 6 46 in Weight 0 7 kg 24 69 oz 1 0...

Страница 21: ...or 20 m 65 62 ft EAFR 06 25 65C2013G04 Arc light plastic fiber sensor 25 m 82 02 ft EAFR 06 30 65C2013G05 Arc light plastic fiber sensor 30 m 93 43ft EAFR 06 35 65C2013G06 Arc light plastic fiber sens...

Страница 22: ...ement between Eaton and the purchaser THERE ARE NO UNDERSTANDINGS AGREEMENTS WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OTHER THAN THOS...

Отзывы: