Installation
Copyright © 2007-2010 Eaton Corporation. All Rights Reserved.
IPN 997-00012-52D July 2010
31
120V supply
208 - 240V supply
Conductors:
14 AWG x 3
14 AWG x 3
Rated:
15A, 125V
15A, 250V
Jacket type:
SJT
SJT
Connectors:
NEMA 5-15P or L5-15P and
IEC 60320-C15
NEMA 6-15P or L6-15P and
IEC 60320-C15
Quail Electronics:
1683.120 (length 10'), or
1683.144 (length 12').
Quail Electronics:
5076.096 (length 8'), or
5076.120 (length 10')
Power Fig.com:
PF51514C1596 (length 8'), or
PF51514C15180 (length 15')
Stay Online Corp:
5486 (length 8')
Suppliers and
part numbers:
World Cord Sets: 88-92310
World Cord Sets: 88-92320
Quail Electronics
2171 Research Drive, Livermore CA 94550
Tel: (800) 669 8090, Email: [email protected], www.quail.com
Power Fig.com
3301 Bramer Drive, Raleigh NC 27604-1655
Tel: (919) 861 0225, www.powerfig.com
Stay Online Corp
3301 Bramer Drive, Raleigh NC 27604-1655
Tel: (888) 346 4688, Fax: (919) 510 5466, www.stayonline.com
World Cord Sets
P. O. Box 1111, Enfield CT 06083
Tel: (860) 763 2100, Fax: (860) 763 1183
Email: [email protected], www.worldcordsets.com
Step 2 - Replace all covers on the APS
Step 3 - Connect at the ac supply point
1
Check the ac supply point is isolated.
2
Connect the ac cord(s) or conduit wires to the ac supply point, as required.
Follow the manufacturer's instructions and local wiring regulations.
3
Label the connection at the ac supply point.
Step 4 - Check terminations, secure cable and test insulation
1
Check all terminations are correct and are tightened.
2
Secure the cord(s) or cable to ensure there is no strain on the terminals.
3
Test the insulation resistance of the conductors according to local ac wiring
regulations.
Procedure complete
Do not switch on the ac supply at this stage.