Access Power Solutions Installation Guide (APS3-400 Series)
96
Copyright © 2007-2010 Eaton Corporation. All Rights Reserved.
IPN 997-00012-52D July 2010
Digital Outputs (Relays)
Test
Test procedure
Adjustment
Digital Output 1
Note 1
•
Refer to
Digital Outputs
in the system controller handbook.
Follow the instructions to manually change the state of the
digital output.
•
When the digital output is
Active
, check any remote alarms
are extended.
•
When the digital output is
Inactive
, check any remote
alarms are return to their original state.
Digital Output 2
As for Digital Output 1.
Digital Output 3
As for Digital Output 1.
Digital Output 4
As for Digital Output 1.
Digital Output 5
As for Digital Output 1.
Digital Output 6
Note 2
As for Digital Output 1.
User assigned
Digital Outputs
As for Digital Output 1.
Notes
1
Digital Outputs can also be checked as other system tests are performed.
2
This digital output is typically configured as the
Monitor OK
relay. Test extended alarms by
removing the power to the I/O board. This will de-energize the relay.
Commissioning Completed
Restore the original (backed-up prior to the testing) configuration file.
Use DCTools/Web to change any configuration file settings that were noted as incorrect during
the Commissioning tests.