Eaton 93PM-L 20–200kW (208V) UPS Installation and Operation Manual 164000724—Rev 01
131
4.
On the UPM Select screen, select UPM 1. The UPM Control Screen is displayed.
5.
Tap the
SHUT DOWN MODULE
button.
The UPM status indicates SHUTDOWN. The power module is turned off.
Logic power remains on.
6.
Repeat Steps
selecting UPM 2 to shut down UPM 2.
The UPM status indicates SHUTDOWN. The power module is turned off.
Logic power remains on.
7.
Repeat Steps
selecting UPM 3 to shut down UPM 3.
The UPM status indicates SHUTDOWN. The power module is turned off.
Logic power remains on.
66..33..1100 S
Siinnggllee U
UP
PM
M S
Shhuuttddoow
wnn
To shut down a single UPM:
1.
Tap the
CONTROLS
tab on the main menu navigation bar. The System Control screen is displayed.
2.
Tap the
MODULES CONTROLS
tab on the secondary Control menu navigation bar. The UPM Select
screen is displayed.
3.
On the UPM Select screen, select the UPM to shutdown. The UPM Control Screen is displayed.
4.
Tap the
SHUT DOWN MODULE
button.
The UPM status indicates SHUTDOWN. The power module is turned off. The remaining UPMs continue to
supply the critical load.
Logic power remains on.
66..33..1111 S
Siinnggllee U
UP
PM
M R
Reessttaarrtt
To restart a single UPM from a shutdown state:
1.
Tap the
CONTROLS
tab on the main menu navigation bar. The System Control screen is displayed.
2.
Tap the
MODULES CONTROLS
tab on the secondary Control menu navigation bar. The UPM Select
screen is displayed.
3.
On the UPM Select screen, select the UPM to start. The UPM Control Screen is displayed.
4.
Tap the
START MODULE
button.
The UPM rectifier and inverter turn on. When the inverter reaches full voltage, the UPS is ready to transfer
to the Double Conversion mode and supply the critical load.
66..33..1122 U
UP
PS
S aanndd C
Crriittiiccaall LLooaadd S
Shhuuttddoow
wnn
To perform maintenance or service on the critical load, shut down power to the load:
1.
Turn off all equipment that is being powered by the UPS.
2.
Perform the Load Off procedure in paragraph
Using the UPS LOAD OFF Command
.
The inverter switchgear is open, and the power module is turned off.
3.
Perform the battery charger off procedure in paragraph
.
The rectifier and battery switchgear open.
Содержание 93PM-L IAC-B
Страница 1: ...p n 164000724 Revision 01 20 200 kW 208V UPS Installation and Operation Manual Eaton 93PM L UPS ...
Страница 10: ...x Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 List of Tables ...
Страница 112: ...102 Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 UPS System Installation ...
Страница 148: ...138 Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 Communication ...
Страница 154: ...144 Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 UPS Maintenance ...
Страница 158: ...148 Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 Product Specifications ...
Страница 161: ...Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 151 Warranty ...
Страница 162: ...16400072401 164000724 01 ...