4
−
4
EATON
Powerware 9315 Parallel Capacity/Redundant System
164201150 Rev. E
www.powerware.com
4.
Connect RMP wiring to the terminal block using terminations shown in
Table 4−2.
Table 4−2. RMP Wire Terminations
From RMP A
To SBM
Remarks
TB1−4
TB3−1
TWISTED WIRES (4)
1−2 TURNS PER
3 INCHES
TB1−5
TB3−2
TB1−6
TB3−3
TB1−7
TB3−4
From RMP B (if used)
To SBM
Remarks
TB1−4
TB3−5
TWISTED WIRES (4)
1−2 TURNS PER
3 INCHES
TB1−5
TB3−6
TB1−6
TB3−7
TB1−7
TB3−8
5.
To check the operation of the RMP, ensure that the Parallel
Capacity/Redundant system is supplying the load via the inverters or bypass.
If the indicators on the RMP show the appropriate status, then it is operating
correctly.
If the communications link between the SBM and the RMP is not present, the
RMP will self-test (all indicators flash and the horn beeps at one-second
intervals). If this occurs, check all harness connectors and the fuse for proper
seating. If all connections are secure but the RMP continues to self-test,
replace the fuse with the spare included in the hardware kit. If this does not
correct the problem, contact your local field service office for verification that
the RMP is working correctly.
6.
To test the indicator lamps, press the horn silence button and hold it for
3 seconds. All lamps should light, and the horn will sound continuously
until you release the button.
7.
Repeat steps 1, 2, and 4 through 6 for each RMP you are installing.
8.
If you are installing an RIM or SCM in addition to an RMP, proceed to Chapter 5
or 6, respectively; otherwise, secure the SBM by reversing the steps contained
in procedure To Prepare the SBM for Wiring to an RMP, RIM, SCM, or Remote
EPO" of Chapter 2.
Содержание 9315
Страница 1: ...Powerware 9315 UPS Parallel Capacity Redundant System Installation and Operation Manual ...
Страница 43: ...EATON Powerware 9315 Parallel Capacity Redundant System 164201150 Rev E www powerware com Section II Operation ...
Страница 136: ......
Страница 205: ......
Страница 206: ...164201150 Rev E 164201150E ...