1
−
3
EATON
Powerware 9315 Parallel Capacity/Redundant System
164201150 Rev. E
www.powerware.com
1.1.5
Inspecting and Unpacking Each Cabinet
NOTE:
Refer to the applicable Powerware
®
9315 Installation
manual provided with
the UPMs for UPM unpacking instructions.
The first task in preparing for installation is inspecting and unpacking the SBM.
The SBM is shipped bolted to a cushioned wooden pallet and protected with outer
protective packaging material as shown in Figure 1−1 and a plastic inner covering.
OUTER
PACKAGING
CUSHIONED WOODEN
PALLET
Figure 1−1.Cabinet as Shipped, with Outer Packaging and Pallet
1.
Carefully inspect the outer packaging for evidence of damage during transit.
CAUTION
Do not install a damaged cabinet. Report any damage to the
carrier and contact your local sales or service office immediately.
2.
Use a forklift or other material handling equipment to move the cabinet to a
convenient unpacking area. Insert the forklift jacks between the foam cushions
on the bottom of the unit.
CAUTION
Do not tilt cabinets more than 10 degrees from vertical.
3.
Set each pallet on a firm, level surface, allowing a minimum clearance of
4.6m (15 ft) on each side for removing the cabinets from the pallets.
4.
Cut the steel bands around each cabinet.
Содержание 9315
Страница 1: ...Powerware 9315 UPS Parallel Capacity Redundant System Installation and Operation Manual ...
Страница 43: ...EATON Powerware 9315 Parallel Capacity Redundant System 164201150 Rev E www powerware com Section II Operation ...
Страница 136: ......
Страница 205: ......
Страница 206: ...164201150 Rev E 164201150E ...