PSD-QS (02/16)
Page 59
Tools and Equipment
The purpose of the following list is to highlight key pieces of equipment, tools and materials necessary
for the installation, maintenance and servicing of EarthLinked
®
Heating and Cooling System HVAC
(above ground) equipment.
The professional HVAC technician is expected to have a compliment of standard tools for the general
servicing of refrigeration equipment.
Equipment, Tools and Materials
ITEM
DESCRIPTION
Vacuum Pump (7 CFM or greater capacity with isolation valve)
Evacuation Manifold (for vacuum pump)
Digital Vacuum (micron) Gauge and Isolation Valve
Schrader Valve Core Removal Tool (quantity of 2)
Charging/Evacuating Manifold for R-410A
Charging/Hi-Vacuum Hoses (black, quantity of 6)
Digital Refrigerant Scale
Digital Thermometer
Digital Sling Psychrometer
Air Flow Meter (for air handlers)
Nitrogen Tank with 0
– 600 psig Regulator and Handtruck
Oxy-acetylene Welding Torch Set
15% Silver Brazing Alloy
Refrigerant Recovery Unit (1/2 #/minute minimum vapor capacity)
Recovery Cylinder (50# capacity)
Halogen Leak Detector
Digital VOM
Digital Clamp-on Ammeter
Digital Water Flowmeter (3 to 30 gpm)
Tubing Cutters
Tubing Benders
Nut Driver
Cordless Drill (3/8”)
Swaging Kit
Deburring Tool
Drill Bit Set
Inspection Mirror
Содержание Prime-025
Страница 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Страница 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Страница 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Страница 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Страница 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Страница 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Страница 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Страница 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Страница 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Страница 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Страница 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Страница 42: ...PSD QS 02 16 Page 42 Figure 29 Charging to the Middle Sight Glass Figure 30 Charging to the Top Sight Glass...
Страница 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Страница 53: ...PSD QS 02 16 Page 53...
Страница 54: ...PSD QS 02 16 Page 54...
Страница 55: ...PSD QS 02 16 Page 55...
Страница 56: ...PSD QS 02 16 Page 56...
Страница 57: ...PSD QS 02 16 Page 57...
Страница 58: ...PSD QS 02 16 Page 58...