3) Current Verification
If it is necessary to verify the current flow through the EPS system, it can be checked with a digital DC
ammeter set on the Milliampere scale. The correct electrical currents for nominal system capacities
are listed in Figure 22.
Nominal System Capacity, Tons
Current Rating
1.5 thru 2.5
80 mA +/- 10%
3.0 thru 3.5
120 mA +/- 10%
4.0 thru 6.0
240 mA +/- 10%
Figure 22. EPS Current Ratings
To check the current, disconnect the
“Loop”
wire from the EPS module as shown in Figure 23 and
connect the DC ammeter as shown to measure and verify the current flow.
Figure 23. Test for DC Current
WARNING!
Use extreme caution when checking current through the EPS system. Turn
OFF the main disconnect to the compressor unit when setting up the Ammeter
for the current measurement. Turn the power supply on only after the
Ammeter is in place for the measurement and hands and body are clear of all
electrical circuit conductors. Turn OFF the main disconnect after the current
measurement has been taken and before attempting to disengage the Ammeter
and re-connect the EPS wiring. Failure to do this, could cause personal injury
or death.
Содержание Prime-025
Страница 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Страница 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Страница 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Страница 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Страница 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Страница 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Страница 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Страница 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Страница 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Страница 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Страница 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Страница 42: ...PSD QS 02 16 Page 42 Figure 29 Charging to the Middle Sight Glass Figure 30 Charging to the Top Sight Glass...
Страница 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Страница 53: ...PSD QS 02 16 Page 53...
Страница 54: ...PSD QS 02 16 Page 54...
Страница 55: ...PSD QS 02 16 Page 55...
Страница 56: ...PSD QS 02 16 Page 56...
Страница 57: ...PSD QS 02 16 Page 57...
Страница 58: ...PSD QS 02 16 Page 58...