Start-Up Process
1)
System Leak Check
After all indoor and outdoor refrigerant bearing components of the system have been installed and
joints have been nitrogen brazed, pressurize the system prior to evacuation to leak test the system.
Do not exceed 150 psig when pressure testing the compressor unit and indoor system components.
Test for leaks with a sensitive electronic leak detector and bubble solution.
Repair leaks as appropriate prior to evacuation.
Evacuation and charging of the system is done through the compressor unit. All of the refrigerant
containing components in the compressor unit are illustrated in Figures 24 and 25.
The Start-up Process is illustrated in Figure 32.
CAUTION!
During the Evacuation and Initial Charging processes, be sure that ALL
power to the EarthLinked
®
System is OFF. This includes the
compressor unit, air handler and all other electrically powered system
components. Failure to do so will cause lockout on start-up.
Содержание Prime-025
Страница 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Страница 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Страница 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Страница 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Страница 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Страница 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Страница 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Страница 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Страница 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Страница 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Страница 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Страница 42: ...PSD QS 02 16 Page 42 Figure 29 Charging to the Middle Sight Glass Figure 30 Charging to the Top Sight Glass...
Страница 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Страница 53: ...PSD QS 02 16 Page 53...
Страница 54: ...PSD QS 02 16 Page 54...
Страница 55: ...PSD QS 02 16 Page 55...
Страница 56: ...PSD QS 02 16 Page 56...
Страница 57: ...PSD QS 02 16 Page 57...
Страница 58: ...PSD QS 02 16 Page 58...