2)
Evacuation
Refer to Figure 26 and the following procedure:
1. Carefully vent any pressurized nitrogen charge from the compressor unit and system..
2. After venting the pressurized system, use a good quality gage manifold and a non-permeable
hose set as shown in Figure 26. If possible, use two Schrader core removal tools. Install one
on the discharge line access port and the other on the initial charging port. Removal of the
Schrader cores will reduce the time to achieve the desired vacuum.
3. Attach a good quality digital vacuum gage with an isolation valve to the liquid line service valve
access port as shown in Figure 26.
4. Use a well maintained, high quality vacuum pump with an isolation valve, rated at 7 cfm or
greater connected to the gage manifold. Ensure that the vacuum pump oil has been changed
prior to initiating the evacuation process to avoid contamination.
5. Fully open the LP and HP valves and both service valves. Reference Figure 26.
6. Open the vacuum pump isolation valve and start the pump.
Evacuate the system down to
400 MICRONS or less
as read on the digital vacuum gage. After 400 microns or less has
been achieved, isolate the vacuum pump. Wait 5 minutes and read the digital vacuum gage.
The system pressure must not exceed 500 MICRONS WITHIN 15 MINUTES.
If it does,
continue the evacuation to remove any remaining non-condensibles in the system. A dry
system will hold 500 microns for 15 minutes.
A procedure often used to evacuate a system, known as the triple evacuation method, is
detailed in the section of this manual entitled
Triple Evacuation
.
Local codes may require other evacuation criteria, in which case the local codes take
precedence over the evacuation requirements described above.
7. When the system has been successfully evacuated, close the LP and HP valves on the
manifold gage set.
Do not remove the manifold gage set or hoses, as air will be drawn
into the system and defeat the evacuation process.
IMPORTANT!
DO NOT ENERGIZE THE COMPRESSOR WHILE THE SYSTEM IS UNDER
VACUUM. THIS WILL CAUSE DAMAGE TO THE COMPRESSOR.
IMPORTANT!
DO NOT CHARGE THE SYSTEM UNTIL THE CONDITIONS OF STEP #6
ARE COMPLETED!
Содержание Prime-025
Страница 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Страница 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Страница 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Страница 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Страница 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Страница 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Страница 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Страница 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Страница 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Страница 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Страница 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Страница 42: ...PSD QS 02 16 Page 42 Figure 29 Charging to the Middle Sight Glass Figure 30 Charging to the Top Sight Glass...
Страница 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Страница 53: ...PSD QS 02 16 Page 53...
Страница 54: ...PSD QS 02 16 Page 54...
Страница 55: ...PSD QS 02 16 Page 55...
Страница 56: ...PSD QS 02 16 Page 56...
Страница 57: ...PSD QS 02 16 Page 57...
Страница 58: ...PSD QS 02 16 Page 58...