PSD-QS (02/16)
Page 11
Compressor units are shipped from the factory with a low pressure nitrogen holding charge. Carefully
relieve the holding charge when the compressor unit is being prepared to connect refrigerant system
piping.
Caution!
This compressor unit is equipped with
Copeland Ultra 32-3MAF Polyol
Ester Oil
(POE). This is the only brand and type of oil that is
recommended for use with ETI compressor units.
POE oil absorbs significant amounts of moisture from the air very
rapidly. Exposure of the POE oil to air must be minimized. Even a few
minutes of exposure to air can be harmful to the system.
After the initial nitrogen holding charge has been released from the
compressor unit, it is critical that air not be allowed to enter the
compressor unit during the process of preparing compressor unit
refrigerant connections (tube cutting, deburring, cleaning, brazing, etc).
To ensure air does not enter the compressor unit while preparing
refrigerant connections, “trickle” dry nitrogen through the compressor
unit, entering at the access port nearest the Active Charge Control
(ACC), to keep airborne moisture out of the compressor unit and the
POE oil.
Complete preparing and brazing all compressor unit refrigerant
connections at one setting to minimize exposure of open connections
to air. Failure to implement the above precautions will result in an
extended period of time to effectively evacuate the system, and may
adversely affect system performance and cause system failure.
Caution!
REFRIGERANT PIPING CONNECTIONS
Refrigerant joints are to be brazed with 15% silver content brazing
alloy, utilizing the NITROGEN BRAZING PROCESS.
NITROGEN BRAZING PROCESS
PURPOSE:
Utilize the NITROGEN BRAZING PROCESS on all brazed refrigerant
piping connections. This process eliminates oxidation products from
inside joint surfaces.
TECHNIQUE:
“Trickle” nitrogen gas at 1-2 psi pressure through the joint area being
brazed, to displace the oxygen. When oxygen has been displaced,
turn off the nitrogen, and relieve the pressure at the joint to
atmospheric prior to brazing.
CONSEQUENCES:
Failure to displace oxygen with nitrogen at the brazed joint will result
in particulate matter being released into the system. The result is
discoloration of refrigerant oil, contamination of the system and
possible system failure.
Содержание Prime-025
Страница 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Страница 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Страница 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Страница 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Страница 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Страница 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Страница 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Страница 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Страница 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Страница 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Страница 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Страница 42: ...PSD QS 02 16 Page 42 Figure 29 Charging to the Middle Sight Glass Figure 30 Charging to the Top Sight Glass...
Страница 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Страница 53: ...PSD QS 02 16 Page 53...
Страница 54: ...PSD QS 02 16 Page 54...
Страница 55: ...PSD QS 02 16 Page 55...
Страница 56: ...PSD QS 02 16 Page 56...
Страница 57: ...PSD QS 02 16 Page 57...
Страница 58: ...PSD QS 02 16 Page 58...