PSD-QS (02/16)
Page 5
M odel Nomenclature
PSD
-
050
-
1
C
PRIME SERIES
HEAT/COOL
NOMINAL CAPACITY
COMPRESSOR,
VOLTS-PHASE-HZ
REFRIGERANT
025 = 25,000 BTUH = 2.0 TONS
030 = 30,000 BTUH = 2.5 TONS
036 = 36,000 BTUH = 3.0 TONS
040 = 40,000 BTUH = 3.3 TONS
050 = 50,000 BTUH = 4.2 TONS
060 = 60,000 BTUH = 5.0 TONS
1 = 230-1-60
1 = 230-3-60
C = R-410A
Disclaimer
Proper installation and servicing of the EarthLinked
®
Heat Pump is essential to its reliable
performance. All EarthLinked
®
systems must be installed and serviced by a technician authorized by
Earthlinked Technologies. Installation and service must be made in accordance with the instructions
set forth in this manual. Failure to provide installation and service by an ETI authorized installer in a
manner consistent with this manual will void and nullify the limited warranty coverage for the system.
Earthlinked
Technologies shall not be liable for any defect, unsatisfactory performance, damage or
loss, whether direct or consequential, relative to the design, manufacture, construction, application or
installation of the field specified components.
Earthlinked Technologies, Inc.
4151 S. Pipkin Road
Lakeland, Florida 33811 USA
phone: 863-701-0096 | toll-free: 866-211-6102
General Info:
www.earthlinked.com
CSI # 23 80 00
Содержание Prime-025
Страница 15: ...PSD QS 02 16 Page 15 Figure 8 PSD Compressor Unit Electrical Schematic 230 1 60...
Страница 16: ...PSD QS 02 16 Page 16 Figure 9 PSD Compressor Unit Electrical Schematic 230 3 60...
Страница 17: ...PSD QS 02 16 Page 17 Figure 10 PSD Air Heating Cooling Water Heating Application...
Страница 18: ...PSD QS 02 16 Page 18 Figure 11 PSD Air Heating CoolingWater Heating Field Wiring Diagram...
Страница 20: ...PSD QS 02 16 Page 20 Figure 11a SureStart Mode of Operation...
Страница 27: ...PSD QS 02 16 Page 27 Figure 15 Disassembled Plug Connector...
Страница 34: ...PSD QS 02 16 Page 34 Figure 24 PSD Internal Flow Schematic...
Страница 35: ...PSD QS 02 16 Page 35 Figure 25 PSD Piping...
Страница 37: ...PSD QS 02 16 Page 37 Figure 26 Evacuation of PSD System...
Страница 39: ...PSD QS 02 16 Page 39 Figure 27 Initial Charge of PSD System...
Страница 41: ...PSD QS 02 16 Page 41 Figure 28 Final Charge of PSD System...
Страница 42: ...PSD QS 02 16 Page 42 Figure 29 Charging to the Middle Sight Glass Figure 30 Charging to the Top Sight Glass...
Страница 44: ...PSD QS 02 16 Page 44 Figure 32 Start Up Process...
Страница 53: ...PSD QS 02 16 Page 53...
Страница 54: ...PSD QS 02 16 Page 54...
Страница 55: ...PSD QS 02 16 Page 55...
Страница 56: ...PSD QS 02 16 Page 56...
Страница 57: ...PSD QS 02 16 Page 57...
Страница 58: ...PSD QS 02 16 Page 58...