P/N: 975389
|
Rev: current
|
ECO: xxxxx
www.dynisco.com
From lab to production,
providing a window into the process
-16-
4.1.3
Assemble Base to Mast
•
Loosen the four connector set screws on the lower end of item 1
•
Slide the four T-nuts on the lower end of item 1 into two slots of item 13, orienting
the mast assy as shown
•
Position item 1 approximately in the center of item 13
•
Tighten the four connector set screws on the lower end of item 1
CAUTION: The positioning of the mast to the base described above may not provide
the most stable configuration when an RSU is later mounted to the stand.
Repositioning the mast relative to the base may provide additional stability
(installation specific).
Содержание ViscoIndicator
Страница 20: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 20 ...
Страница 28: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 28 ...
Страница 38: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 38 ...