5.1.5
Install PIV
•
Install end of the PIV assy hand tight into the free end of the extension tube assy
•
Install the PIV assy so the shaft of the burst plug is positioned above the PIV and
pointing directly upwards
•
Using a 1” wrench and a 7/8” wrench, tighten the extension tube nut into the PIV
assy to 25 ft-lbs (42 ft-lbs max)
5.2
Connect VI system assy to Process Connection
NOTE: Item numbers in this section refer to item numbers on drawing PIV-I-HALF20
(included at the end of this section), unless noted.
5.2.1
Adjust RSU height/angle to match process connection height/angle
CAUTION: The following step requires two people.
CAUTION: The RSU/IRSU-MOUNT weighs approx.40 lbs. Only physically
capable personnel should lift/support this assembly.
•
Position the VI system up to the process connection, and note the alignment of the
PIV to the RSU (head).
•
Raise or lower the RSU as necessary to match the PIV alignment as follows:
•
While one person supports the RSU/IRSU MOUNT, another person loosens the four
M5 screws that support the RSU (red circles show 2 screws, other 2 screws are on
the other side of the stand)
Содержание ViscoIndicator
Страница 20: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 20 ...
Страница 28: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 28 ...
Страница 38: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 38 ...