P/N: 975389
|
Rev: current
|
ECO: xxxxx
www.dynisco.com
From lab to production,
providing a window into the process
-37-
5.3
Install PIV heater and RTD
•
Apply anti-seize to bayonet fitting threads (item 6) and install fitting into PIV
•
Install heater block (item 4) using four screws (item 5) with anti-seize
NOTE:
install heater block so small set screw (item 13) is accessible
•
Apply anti-seize to the heater cartridge (item 12) and secure in heater block thru
hole using small set screw (item 13). Position heater length in middle of heater
block thru hole.
•
Install PIV spring loaded RTD (item 7) in the bayonet fitting:
o
Insert the PIV RTD into the bayonet fitting, aligning the slot in the PIV RTD fitting
with the tab in the bayonet fitting
o
Continue pressing down on the RTD into the bayonet fitting and compress the
RTD fitting spring until the bayonet tab is fully inserted into the RTD slot
o
Rotate the RTD fitting clockwise to locking it into the bayonet fitting tab.
Содержание ViscoIndicator
Страница 20: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 20 ...
Страница 28: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 28 ...
Страница 38: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 38 ...