Place a rag/gloved hand under the RSU capillary hole where the capillary is still
positioned.
•
Push the brass rod end of capillary tool assy down into the RSU from above, through
the now open burst plug hole, to push the capillary out of the flowblock.
•
capture the capillary as it exits the flowblock and place it in a safe location to cool
9.3.2
Capillary Installation
•
Reinstall burst plug into top of VI head
•
Thread capillary plate onto aluminum capillary tip of capillary tool assy again
•
Place capillary onto aluminum capillary tip of capillary tool assy
•
Slide capillary into VI head flow block until capillary retaining plate is flush against
flow block surface
•
Reinstall 4 screws captured by retaining plate into flow block
•
Carefully unthread capillary tool, then pull tool assy down and away from VI head
9.4
Detaching VI main system from process connection
•
Bring the system to normal operating temperature (process temp)
•
Close the PIV
•
Confirm the ViscoIndicator is not at pressure and the PIV is closed
•
Shut the VI system down and unplug the power from the RCU
•
Perform the following steps while the VI is still at temperature:
o
Remove any insulation wrapped around the PIV
o
Perform steps from section 5.3 in reverse order to remove the PIV RTD, PIV
bayonet fitting, and PIV heater block with heater.
NOTE it is not necessary to remove the PIV heater from the PIV heater block.
o
Remove the four SHCS 3/8"-16 x 1.5" lg, Dynisco p/n F714, screws that clamp
the PIV to the flow block in the RSU.
o
Unlock the casters of the IRCU-STAND if locked
o
Check if the PIV/flow block connection pulls apart easily
o
If PIV/flow block connection will not pull apart easily, use two 1/4-20 thd jack
out screws located in-between the four screws that had held the PIV to the flow
block to break the connection.
•
Disconnect the cable connections (all connections) between the process connection
parts and the RSU
•
With all four casters unlocked, roll the VI assy away from the extruder, leaving the
process connection and PIV in place attached to the extruder.
9.5
Preparing VI system for shipment
•
Retain original Dynisco RSU and RCU shipping boxes
•
Remove all cabling and Vortex coolers from the RSU and RCU before shipment.
Содержание ViscoIndicator
Страница 20: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 20 ...
Страница 28: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 28 ...
Страница 38: ...P N 975389 Rev current ECO xxxxx www dynisco com From lab to production providing a window into the process 38 ...