Operation (CME)
5-10
•
Once the desired amount of “HTF” has been attained and
the glycol level gauge is showing ½ full, turn the supply
ball valve
figure 35
(21-1) to the “Closed” position and
continue with the following procedures.
•
Turn the fill/drain ball valve
figure 36
(22-2) to the
“Closed” position.
•
Toggle the pump switch
figure 37
(23-1) to the “Off”
(down) position.
•
Turn the supply ball valve
figure 35
(21-2) back to the
“Open” position.
Figure 37-600 GTS Control Panel Pump Switch
Figure 38-Glycol Level
Gauge
Содержание 600 GTS Series
Страница 2: ......
Страница 47: ...Appendix 9 3 Electrical Schematics Figure 56 600 GTS sub 40 Electrical Schematic...
Страница 48: ...Appendix 9 4 Figure 57 600 GTS Electrical Schematic...
Страница 49: ...Appendix 9 5 Figure 58 HR2250 Electrical Schematic...
Страница 50: ...Appendix 9 6 Figure 59 Trailer Wiring Schematic...