53
VAPORSTREAM INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
Rapid-sorb
STEAM SUPPLY CONNECTIONS TO RAPID-SORB HEADER
Connect the steam supply interconnecting piping from the humidifi er to the
Rapid-sorb. The steam supply piping requires a minimum of 1/8"/ft (1%) pitch
toward the header.
If multiple humidifi ers are supplying one Rapid-sorb, a multiple steam supply
connector is needed. Typically, the multiple steam supply connector attaches to
the Rapid-sorb header supply end with hose cuff and clamps:
1. Route the necessary number of steam supplies from the humidifier tanks to
the steam supply connector.
2. Position the steam supply connector to accept the steam supplies while
maintaining the necessary pitch.
3. Make sure the hose clamps on the steam supply connector and header are
tight.
CONDENSATE DRAIN CONNECTIONS TO RAPID-SORB HEADER
Piping must be minimum ¾" I.D. (DN20) and rated for 212 °F (100 °C)
minimum continuous operating temperature.
The condensate drain line must be piped as shown in Figures 48-1 and 50-1.
Provide a 6" (152 mm) drop prior to a 5" (127 mm) water seal to:
• Ensure drainage of condensate from the header
• Keep steam from blowing out of the drain line
After the water seal, run the drain line to an open drain with a 1" (25 mm)
vertical air gap.
• Cut the drain line at a 45° angle on the end above the drain to permit a
direct stream of water into the drain pipe while maintaining a 1" (25 mm)
air gap.
• Locate air gap only in spaces with adequate temperature and air movement
to absorb fl ash steam, or condensing on nearby surfaces may occur.
All drain lines must be installed and sized according to governing codes.
ULTRA-SORB
For Ultra-sorb steam dispersion panel instructions, see the installation,
operation, and maintenance manual shipped with the Ultra-sorb.
mc_060210_1300-NA
INSTALLATION
Dispersion:
Ultra-sorb