![Dräger Medical Zeus Скачать руководство пользователя страница 141](http://html.mh-extra.com/html/drager-medical-0/zeus/zeus_technical-documentation-manual_2527091141.webp)
- p
ag
e 8 -
Zeus
2
005-03 Rele
a
sed
2.4
Ele
c
tri
ca
l s
a
fety to IEC 60-601
Precondition:
Zeus is s
w
itched o
ff
.
IEC
6
01/1 is
a
n intern
a
tion
a
l st
a
nd
a
rd
f
or type testin
g
o
f
m
edic
a
l devices. It is not intended
f
or
repe
a
t
m
e
a
sure
m
ents. Most countries do not h
a
ve repe
a
t
m
e
a
sure
m
ents
f
or
m
edic
a
l devices
a
s
is the c
a
se in Ger
ma
ny (
V
DE 0
7
51). There
f
ore section 18 (protective e
a
rth conductor test)
a
nd
section 19 (le
akag
e current test) o
f
the IEC
6
01/1
a
re used.
S
ince the co
m
plete electric
a
l s
af
ety tests
a
ccordin
g
to IEC
6
01/1 is very extensive
a
nd not
f
e
a
sible in the
f
ield, this test instruction is
a
pplic
a
ble:
Protective e
a
rth conductor test,
Le
akag
e current tests in nor
ma
l
m
ode
a
nd
w
ith interrupted PEN conductor.
This corresponds to tests
a
ccordin
g
to
V
DE 0
7
51.
The le
akag
e current test
w
ith interrupted PE
a
nd the housin
g
le
akag
e current test
a
re not
a
pplic
a
ble.
Re
a
son:
Dr
äg
er devices h
a
ve been type-tested
a
ccordin
g
to IEC
6
01/1
a
nd co
m
ply
w
ith the co
m
plete
s
af
ety re
q
uire
m
ents. Recurrent
m
e
a
sure
m
ents
a
re intended to sho
w
s
a
ny ch
a
n
g
es.
The protective e
a
rth conductor test
mak
es sure th
a
t the PE is not interrupted.
Ch
a
n
g
es in the housin
g
le
akag
e current
a
re only to be expected
af
ter desi
g
n ch
a
n
g
es. Ho
w
ever,
desi
g
n ch
a
n
g
es in the
f
ield, i
f
a
ny,
a
re only c
a
rried out
a
ccordin
g
to
a
ppropri
a
te conversion
instructions.
2.4.1
Prote
c
ti
v
e e
a
rth
c
ondu
c
tor test
Connect the test probe to the
f
ollo
w
in
g
test points one
af
ter the other:
Ground stud on the
ma
ins input soc
k
et.
Ground studs on
a
uxili
a
ry soc
k
et-outlets.
PE cont
a
cts on
a
uxili
a
ry soc
k
et-outlets.
Enter the hi
g
her test v
a
lue in the test report.
The test to UL
26
01-1 is s
a
tis
f
ied by testin
g
to IEC
6
0-
6
01-1. Di
ff
erin
g
li
m
it v
a
lues
a
re
ma
r
k
ed.
Note re
ga
rdin
g
wa
ll-
m
ounted
a
nd ceilin
g
-
m
ounted devices
w
ith per
ma
nently
w
ired po
w
er c
a
ble:
The protective conductor
m
e
a
sure
m
ent should be t
ak
en bet
w
een
g
rounded
m
et
a
l p
a
rts o
f
the
ceilin
g
pend
a
nt/
wa
ll
m
ountin
g
a
nd the Zeus.
Connect the test c
a
ble
f
or protective conductor cont
a
ct resist
a
nce
7
90088
2
to the tester. The
bl
a
c
k
conductor o
f
this test c
a
ble is
w
ired to the e
a
rthin
g
cont
a
cts o
f
the three-pin plu
g
.
Connect the bl
a
c
k
conductor o
f
the test c
a
ble to the
m
et
a
l p
a
rts o
f
the ceilin
g
pend
a
nt/
wa
ll
m
ountin
g
. Usin
g
the test probe o
f
the tester
m
e
a
sure the resist
a
nce to the
m
et
a
l p
a
rts o
f
the Zeus
listed
a
bove.
5
2.4.1.1
PE
c
ondu
c
tor test
va
lue
[_______OK]
Test
v
a
lue includin
g
po
w
er c
a
ble: R less th
a
n/e
q
u
a
l to 0.3 oh
m
s
Содержание Zeus
Страница 1: ...5133 001 9036190 Revision 3 0 Because you care Technical Documentation Zeus Anesthetic workstation ...
Страница 2: ......
Страница 8: ...All rights reserved Copyright reserved K5133001IECIVZ fm 03 05 06 VI Contents ...
Страница 9: ...1 General ...
Страница 10: ...2 ...
Страница 15: ...7 Function Description ...
Страница 16: ...8 ...
Страница 85: ...77 Maintenance Procedures ...
Страница 86: ...78 ...
Страница 115: ...107 Schematics and Diagrams ...
Страница 116: ...108 ...
Страница 127: ......
Страница 128: ...119 Annex Technical Documentation acc to EMV standard IEC EN 60601 1 2 2001 Test List Spare Parts Catalogue ...
Страница 129: ...120 ...
Страница 133: ......
Страница 163: ......
Страница 165: ......
Страница 178: ......