27
LEADING IN PRODUCTION EFFICIENCY
Operating Manual
© Dürr Systems AG
ED3K_Operating_Manual_Rev02LD_03Lug2020_EN. docx
Rev.02 – 03.07.2020
6
Assembly Instructions
A T T E N T I O N
The following operations can be performed only by adequately trained personnel. See
chap. 3 of this manual.
C A U T I O N
You must wear personal protective equipment.
Always wear the following equipment during assembly operations.
6.1 Electrical connection
power supply
Use terminals
1-2-3
Use cable sect.
2.5 mm²
See the wiring diagram Available to be attached to this Manual
ground connection
The frame has to be connected to the ground
through the dedicated terminal