Operating Manual
© Dürr Systems AG
EcoBell2 SL EC - Rotating Atomizer with External Charging
Faults
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
117 / 156
Cleaning
- in chapter “Cleaning”.
Maintenance
- Removing and installing the bell disk
- Removing and installing the nozzle
- Removing and installing the atomizer body
Pos: 61 /INP/ Bell2/08_05 Ve ntilblock Mo ntage_AA @ 40\mod_1411033050547_20.docx @ 502529 @ 233 @ 1
9.1
Mounting the valve block
The valve block must be dismantled together with the atomizer body.
All subsequent work can then be carried out in the workshop.
The valve block must be dismantled for the following procedures:
- Dismantling of the electrode ring
- Work on the turbine
- Work on the fiber optics
- Work on the shaft detent
- Work on the main needle
- Work on the color tube
- Work on the rinsing valve
- Hose change at the flange assembly
9.1.1
Dismantling the valve block
If further work is to be carried out after the dismantling, remove the
bell disk first. Information regarding the dismantling of the bell disk can
be found in the chapter "Dismantling the bell disk”.
N O T I C E
Danger of damage to property and interruption of production
The atomizer may fall down.
Hold the atomizer before releasing the clamping screw.
• Hold the atomizer.
• Release the central clamping screw of the atomizer in the
electrode ring.
• Remove the atomizer.