5.2.1
Requirements for the installation point
The atomizer must be supplemented with other components to an
electrostatic spray system.
The atomizer completes the spray system. All other components must
already be installed in accordance with the information in the chapter
"Technical Data”:
- Control system
- High tension supply
- Media Lines
- Pneumatic lines
- Painting booth (ATEX Zone).
5.2.2
Prerequisites for installation
- Energy supply completely switched off and secured against being
switched on again.
- Media lines depressurized.
- Atomizer mount exists.
5.2.3
Flange assembly
5.2.3.1
Assemble the atomizer
Fig. 20: Flange assembly with high voltage terminal
1
Flange assembly
2
Cable for potential equalization
3
High voltage connection
4
Grub screw for high voltage connector
The flange assembly is pre-assembled. All hoses are attached.
Ground line and high voltage cables must remain connected.