Operating Manual
© Dürr Systems AG
EcoBell2 SL EC - Rotating Atomizer with External Charging
Faults
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
123 / 156
Fig. 172: Mounting bolts for the chuck
• Turn the valve block around.
• Pull the chuck out.
Fig. 273: Removing the chuck
1
Chuck
• Slide the special tool on the light conductor.
Fig. 374: Dismantling the light conductor
1
Special Tool
2
Light conductor