Operating Manual
© Dürr Systems AG
134 / 156
EcoBell2 SL EC - Rotating Atomizer with External Charging
Faults
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
9.6.5
Mounting the paint pipe
The following is prerequisite for mounting the paint pipe on the valve
block:
- The paint pipe is clean.
- The seal of the paint pipe on the valve block is new or like new.
- The flange surface on the valve block is clean and undamaged.
Following steps are to be undertaken:
• Put seal in the sealing surface on the valve block.
• Align the paint pipe to the flange surface of the valve block.
Check the markings in the paint pipe and the valve block.
Fig. 92: Markings on the paint pipe and valve block
A T T E N T I O N
Risk of property damage and production disruption
Over-tightening the screws will pull the thread inserts from their
housings.
Observe the tightening torque.
• Tighten the three screws in turn with 0.8Nm max.
Once the paint tube is installed, the following work is yet to be carried
out:
- Mount the contact ring.
- Attach the nozzle.
- Mount the main needle valve.
- Attach the chuck.
- Assemble the shaft detent.
- Attach the valve block.
Pos: 67 /INP/ Bell2/08_11 Spül_RF_Ventil aus_ein_AA @ 57\mod_1504011750540_20.docx @ 620241 @ 233 @ 1