84
JT920/JT920L - SETUP
ASSEMBLE DRILL STRING
84
JT920/JT920L - SETUP
ASSEMBLE DRILL STRING
Attach Transition Sub
1.
Apply tool joint compound to threads and thread transition
sub onto saver sub.
2.
Align drill pipe flats of EZ-Connect box with front wrench of
drill frame.
3.
Start drilling unit engine.
4.
Use machine power to slowly rotate spindle and transition
sub onto EZ-Connect box.
5.
Tighten to full machine torque.
Attach Transition Sub
1.
Apply tool joint compound to threads and thread transition
sub onto saver sub.
2.
Align drill pipe flats of EZ-Connect box with front wrench of
drill frame.
3.
Start drilling unit engine.
4.
Use machine power to slowly rotate spindle and transition
sub onto EZ-Connect box.
5.
Tighten to full machine torque.
Содержание JT920
Страница 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Страница 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Страница 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Страница 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Страница 128: ...128 JT920 JT920L LUBRICATION DRILLING FLUID PUMP 128 JT920 JT920L LUBRICATION DRILLING FLUID PUMP...
Страница 167: ......
Страница 168: ......
Страница 169: ...JT920 JT920L 169 JT920 JT920L 169...