158
JT920/JT920L - APPENDIX
C. DRILLING FLUID REQUIREMENTS
158
JT920/JT920L - APPENDIX
C. DRILLING FLUID REQUIREMENTS
C. DRILLING FLUID REQUIREMENTS
Backreaming is only successful when enough fluid reaches the
bore. The amount of fluid needed depends on sizes of bore,
pullback material, and nozzles.
The chart on the next page can be used to determine the
minimum amount of fluid needed in perfect conditions.
Use
more than amount indicated or bore might be dry and
unsuccessful.
C. DRILLING FLUID REQUIREMENTS
Backreaming is only successful when enough fluid reaches the
bore. The amount of fluid needed depends on sizes of bore,
pullback material, and nozzles.
The chart on the next page can be used to determine the
minimum amount of fluid needed in perfect conditions.
Use
more than amount indicated or bore might be dry and
unsuccessful.
Содержание JT920
Страница 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Страница 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Страница 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Страница 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Страница 128: ...128 JT920 JT920L LUBRICATION DRILLING FLUID PUMP 128 JT920 JT920L LUBRICATION DRILLING FLUID PUMP...
Страница 167: ......
Страница 168: ......
Страница 169: ...JT920 JT920L 169 JT920 JT920L 169...