34
Operating instructions
•
DINO 120T
•
120TB
5.1.4. Supporting the lift
1.
Lower the front support outriggers (on the tow-bar side).
2.
Lower the support outriggers in the rear. (do not damage the tow-bar jockey wheel).
3.
Level the chassis with the outriggers with the help of the level gauge (16). The air bubble
must be located inside the inner ring.
4. The green signal light in the chassis control centre LCB is illuminated, when all the
outriggers are in the support position and the limit switch circuit of the outriggers is
closed.
Always check, before using the lift that:
• the chassis is level, using the position indicator
• the wheels are off the ground
•
the outriggers are firmly supported on the ground, and the limit switch circuit of the
outriggers is closed (green LED in the chassis control centre is illuminated)
DANGER
WARNING
CAUTION
NOTICE
The operation is prohibited, if the lift is not properly supported and on a level
position.
Observe the effect of ice, possible rain and inclination of the surface on the support
(the support outriggers must not slip on the surface).
Содержание DINO 120T
Страница 2: ......
Страница 3: ...3 TRANSLATION OF THE ORIGINAL INSTRUCTIONS Valid from serial number 120T 120328 120330 120TB 60001...
Страница 6: ...6 Operating instructions DINO 120T 120TB BLANK...
Страница 11: ...11 2 2 REACH DIAGRAM...
Страница 45: ...45 BLANK...
Страница 50: ...50 Operating instructions DINO 120T 120TB NOTES...
Страница 51: ...51 NOTES...
Страница 55: ...55 7 2 LUBRICATION PLAN 5 8 6 10 6 7 13 4 2 1 11 3 9 12...
Страница 61: ...61 BLANK...
Страница 62: ...62 Operating instructions DINO 120T 120TB BLANK...
Страница 64: ...64 Operating instructions DINO 120T 120TB NOTES...
Страница 65: ...65 NOTES...