![Diatron Abacus + Скачать руководство пользователя страница 40](http://html.mh-extra.com/html/diatron/abacus/abacus_service-manual_2494683040.webp)
Diatron MI PLC
rev 1.09
40
4.2. Main functions of fluidic system
4.2.1. Initialization
Fluidic initialization process performs the following steps:
Positioning all mechanical components (stepper motors) by scanning moving range
(with end-switches)
Checking the atmospheric pressure
Checking of pump and pressure sensor by generating measuring vacuum
Priming of reagents and calibrating reagent sensors
Fill the tubing with the reagents
Cleaning of tubing & measuring chamber
Cleaning of aperture with high-pressure back-flush, cleaner reagent & high-voltage
burning
4.2.2. Wake up
If the instrument is in standby state the wake up process is taken place in order to make the
instrument ready to measure. During this process the needle is go out and down to the
sampling position and the M1 and M2 stepper motor hold it until the start button pressed or
the instrument go into standby. While the needle is moving the microdilutor (M5) is aspirate
some air into the needle (this bubble is going to separate the dilent and the blood). After this
procedure the status LED is turned blue and measurement can be started.
Simultaneously the MIX and the WBC chamber is drained (WBC draining, MIX
WBC, WBC
draining). During the last WBC chamber draining the MIX is filled with 5.0 ml diluent. Then
this volume is moved into the WBC chamber.
Содержание Abacus +
Страница 6: ...Diatron MI PLC rev 1 09 6 ...
Страница 95: ...Abacus Service Manual rev 1 09 95 10 3 Abacus cabling diagram ...