
Pictures for illustrati ng pur poses o nly
7
•
Unpack the unit and check for any dama-
ge. A drilling template is supplied with
the packing : make sure to pick it up
before throw ing away the packing ma-
terial.
•
Damage to packing and/or unit must be
noticed to carrier by registered letter wi-
thin 3 working days.
•
Prov ide free space all around the unit : 1 m. to
1.20 m. from the floor of the humidif ier, 1.25
m. ahead & 0.80 m. on the right hand side for
allowing access for maintenance.
•
Flatten the supplied drilling template
against the mounting wall and mark the
mounting holes. Drill the 7 (seven) holes
(for RTH 5 to 50) or the 11 (eleven) holes
(for RTH 60 to 100).
•
Insert screws and bolts appropriate for
support (3 upwards and 4 (RTH 5 to 50)
or 8 (RTH 60 to 10) downwards (see af-
ter page 8).
•
Screw the 3 (three) upper screws allo-
wing about 10 mm for hanging the cabi-
net. Hang the cabinet and tighten the
upper screws for securing the mounting.
•
Untighten the screwing knob (1) a little,
tip the stainless steel tank (2) up to tigh-
ten the tank holding steel cord (3).
•
Take the cover off the water level tank
(4).
1
2
3
4
Drain hose (supplied)
E
LECTRO
V
AP
RTH-V2
Unit wall installation