
Pictures for illustrati ng pur poses o nly
22
Recommandations:
All w orks concerned w ith the electrical installation must be carried out by skilled
and qualified personnel (eg electrician w ith appropriate training). The customer
is responsible for ensuring their suitability. Please observe local regulations
concerning the provision of electrical installations.
Check all electrical ter minal screw s at commissioning, after 50 hours operation
and at every service thereafter.
Take care : the RTH electronic components are very sensitive to electrostatic
shocks. Appropriate steps must be taken before any operation.
E
LECTRO
V
AP
RTH-V2
Electrical installation