159
Installation and Operating Manual for RPI M15A M20A Solar Inverter V1.0 2016-03-18
13 Shutdown, storage
8.
Close the DC terminals with the sealing caps.
Removing the communications cable
9.
Twist off the cable gland from the communications connector
and withdraw the gland and seal.
10.
Remove the cover screws and then the cover.
11.
Withdraw the communications card.
12.
Remove the cables and reinsert the communications card.