9 Settings
Installation and Operating Manual for RPI M15A M20A Solar Inverter V1.0 2016-03-18
102
9.16 External power off (EPO)
Overview
You can use this function to set the relay for external power off
(EPO) as normally open or normally closed.
To change this setting you will need a special
password which you can obtain from Delta cus-
tomer service. You will find the contact data on
the last page of this document.
Path to the menu item
Main Menu
>
Settings
>
Install Settings
>
EPO 1
Setting options
Parameter
Description / Setting range
EPO 1
Setting the relay as (Normally closed) or
(Normally open).
Setting range:
Normal open
|
Normal close
Setting the relay for EPO 1
The procedure is identical for both relays.
1.
If the default information is displayed, press the
EX IT
button
to open the main menu.
Alternatively, press the
EX IT
button repeatedly until the main
menu is displayed.
20
15
10
5
0
4
8
12
16
20
24
kW
2013.06.21
kWh
kWh
kg
2013.06.21
Hour
Peak Hours:
E-Day:
Day CO2 Saved:
Exit
Year
21. Jun 2013 09:30
Energy Log - Day
2.
Using the
and
buttons, select the
Settings
entry
and press the
ENT
button.
E-Today
Power Meter
Energy Log
Event Log
Inverter Information
Settings
Operation Data
21. Jun 2013 09:30
Menu
3.
Using the
and
buttons, select the
Install Set-
tings
entry and press the
ENT
button.
Personal Settings
Coefficients Settings
Install Settings
Active/Reactive Power Control
FRT
21. Jun 2013 09:30
Settings
4.
Enter the password that you received from Delta customer
service.
Use the
and
buttons to set the individual digits.
Press the
ENT
button to confirm a digit.
3
3
3
3
ENT
21. Jun 2013 09:30
Password