background image

117

Installation and Operating Manual for RPI M15A M20A Solar Inverter V1.0 2016-03-18

9 Settings

4. 

Enter the password that you received from Delta customer 

service.

Use the 

 and 

 buttons to set the individual digits.

Press the 

ENT

 button to confirm a digit.

3

3

3

3

ENT

21. Jun 2013 09:30

Password

5. 

Using the 

 and 

 buttons, select the 

Active Power 

Control

 entry and press the 

ENT

 button.

Active Power Control

Reactive Power Control
 
 
 
 
 

21. Jun 2013 09:30

Active / Reactive Power

6. 

Using the 

 and 

 buttons, select the 

Power Limit

 

entry and press the 

ENT

 button.

Power Limit

Power vs. Frequency
P(V)

21. Jun 2013 09:30

Active Power Control

Switching the function on/off

1. 

Using the 

 and 

 buttons, select the 

Mode

 entry and 

press the 

ENT

 button.

%

[        100       ]

Set Point
Actual / Rated Power

Mode

100

[      Rated      ]

[        OFF        ]

21. Jun 2013 09:30

Active Power Control

 

→ The currently set mode is highlighted and can be 

changed.

%

[        100       ]

Set Point
Actual / Rated Power
Mode

100

[      Rated      ]

[        OFF        ]

21. Jun 2013 09:30

Active Power Control

2. 

Using the 

 and 

 buttons, select a mode and press 

the 

ENT

 button.

%

[        100       ]

Set Point
Actual / Rated Power
Mode

100

[      Rated      ]

[        ON         ]

21. Jun 2013 09:30

Active Power Control

Содержание RPI153FA0E0000

Страница 1: ...RPI M15A RPI M20A Installation and Operating Manual Europe general United Kingdom...

Страница 2: ...intended for use by fitters The information contained in this manual may not be reproduced without prior written consent from Delta Energy Systems The information contained in this manual may not be...

Страница 3: ...1 5 2 MPP tracking 21 5 3 Anti islanding device 21 5 4 Temperature control 21 5 5 Influence of DC input voltage 21 5 6 Functions for influencing the operating behaviour 21 5 7 Power grid imbalance com...

Страница 4: ...7 2 Cabling the external power off 64 7 8 Connecting to the grid AC 66 7 9 Connecting to the solar modules DC 69 7 10 Attaching warning labels to the inverter 70 7 11 Connecting a PC via RS485 70 8 C...

Страница 5: ...tion 142 10 2 Standard information 142 10 3 Power meter 143 10 4 Energy log 144 10 5 Event log 146 10 6 Inverter information 147 11 Error messages and troubleshooting 148 11 1 Errors 149 11 2 Warnings...

Страница 6: ...ained and approved for the installation commissioning and operation of solar inverters in grid connected solar installations 1 3 Warning notices and warning symbols In this manual the following warnin...

Страница 7: ...work step If required the result of the work step is described here This serves as a check that the work step has been performed correctly 2 Second work step 3 Third work step If a work instruction c...

Страница 8: ...nless you are wearing safety gloves The inverter is very heavy The inverter must be lifted and carried by at least two people Only SELV compliant EN 60950 devices may be connected to the RS485 ports T...

Страница 9: ...blic power grid to convert the direct current generated by the solar modules in the solar installation into alternating current which is fed into the public power grid Use in compliance with the power...

Страница 10: ...tibility EN 61000 6 3 2007 A1 2011 EN 61000 6 4 2007 A1 2011 EN 61000 3 11 2000 EN 61000 3 12 2005 EN 61000 6 2 2005 EN 61000 6 1 2007 EN 61000 4 2 2009 EN 61000 4 3 2010 EN 61000 4 4 2012 EN 61000 4...

Страница 11: ...henol C16 3 Mounting plate 1 Installation quick start and basic safety instructions 1 Installationsk urz anleitung RPI M15A RPI M20A Deutschland sterreich Schweiz DC plugs 4 Multi contact MC4 for DC f...

Страница 12: ...tions Component Connection Description 1 Display buttons status LEDs Refer to 4 3 Display buttons status LEDs page 13 2 Air outlets Refer to 4 5 Fans and air outlets page 17 3 Electrical terminals Ref...

Страница 13: ...trag Tag Component Description Use LEDs StAtuS Multi coloured LED indicates the current operating status Buttons EX IT Exit Exit the current menu Cancel the setting of a parameter Changes are not adop...

Страница 14: ...verter Description 1 Grounding connection Refer to 4 4 2 Grounding connection page 15 2 AC terminal AC OUTPUT Refer to 4 4 3 AC terminal AC OUTPUT page 15 3 Connector for RS485 dry contacts and digita...

Страница 15: ...inverter 4 4 3 AC terminal AC OUTPUT Fig 4 4 Position of the AC terminal on the inverter The inverter is connected to the public grid by means of the AC terminal Purpose To supply alternating current...

Страница 16: ...ions Connection Connection type 2x RS485 DATA and DATA Terminal block 1x VCC 12 V 0 5 A Terminal block 1x dry contacts Terminal block 1x external power off EPO RJ45 4 4 5 DC disconnector DC SWITCH Fig...

Страница 17: ...C terminals Required plug type Multi contact MC4 32 0017P0001 UR for DC Multi contact MC4 32 0016P0001 UR for DC 4 pairs of DC plugs are included in the delivery 4 5 Fans and air outlets Fig 4 8 Posit...

Страница 18: ...or RPI M15A M20A Solar Inverter V1 0 2016 03 18 18 4 6 Mounting holes Fig 4 10 Position of the mounting holes on the inverter The mounting holes are used to bolt the inverter to the wall or to the mou...

Страница 19: ...onds after the power supply is disconnected Never open the inverter housing The inverter does not contain any parts that can be serviced or repaired by the operator or the fitter Opening the inverter...

Страница 20: ...21kVA max Maximum reactive power 24A max 32A max Maximum AC current 3P3W or 3P4W 3P3W or 3P4W The inverter can be connected to 3 phase grids with no neutral conductor 3P3W 3 phases PE and 3 phase grid...

Страница 21: ...the operating temperature range the output power will be continually reduced with rising ambient temperature If the ambi ent temperature rises above the operating temperature range the AC output will...

Страница 22: ...plate that is supplied with the inverter Use mounting materials wall plugs screws etc that are suitable for the wall or the mounting system as well as the heavy weight of the inverter To prevent malfu...

Страница 23: ...er is classified IP65 and can be installed inside and outside Nevertheless the inverter should be protected from direct solar irradiation rain and snow by means of a roof If for example the inverter b...

Страница 24: ...rs directly one above another as this might cause mutual heating Take note of the operating temperature range without limit ing and the operating temperature range If the operating temperature range w...

Страница 25: ...6 Planning the installation 6 5 Characteristics 0 70 0 75 0 50 0 55 0 60 0 65 0 80 0 85 0 90 0 95 1 00 1 05 1 10 30 25 35 40 45 50 55 60 P Pn cos 0 9 820 VDC 635 VDC 355 VDC Ambient temperature C Fig...

Страница 26: ...20A Solar Inverter V1 0 2016 03 18 26 0 70 0 75 0 50 0 55 0 60 0 65 0 80 0 85 0 90 0 95 1 00 1 05 1 10 30 25 35 40 45 50 55 60 P Pn cos 0 95 820 VDC 635 VDC 355 VDC Ambient temperature C Fig 6 3 M15A...

Страница 27: ...2016 03 18 6 Planning the installation 0 70 0 75 0 50 0 55 0 60 0 65 0 80 0 85 0 90 0 95 1 00 1 05 1 10 30 25 35 40 45 50 55 60 P Pn cos 1 00 820 VDC 635 VDC 355 VDC Ambient temperature C Fig 6 4 M15A...

Страница 28: ...M20A Solar Inverter V1 0 2016 03 18 28 0 70 0 75 0 50 0 55 0 60 0 65 0 80 0 85 0 90 0 95 1 00 1 05 1 10 30 25 35 40 45 50 55 60 P Pn cos 0 9 820 VDC 635 VDC 470 VDC Ambient temperature C Fig 6 5 M20A...

Страница 29: ...016 03 18 6 Planning the installation 0 70 0 75 0 50 0 55 0 60 0 65 0 80 0 85 0 90 0 95 1 00 1 05 1 10 30 25 35 40 45 50 55 60 P Pn cos 0 95 820 VDC 635 VDC 470 VDC Ambient temperature C Fig 6 6 M20A...

Страница 30: ...M20A Solar Inverter V1 0 2016 03 18 30 0 70 0 75 0 50 0 55 0 60 0 65 0 80 0 85 0 90 0 95 1 00 1 05 1 10 30 25 35 40 45 50 55 60 P Pn cos 1 00 820 VDC 635 VDC 470 VDC Ambient temperature C Fig 6 7 M20A...

Страница 31: ...RPI M15A M20A Solar Inverter V1 0 2016 03 18 6 Planning the installation 6 6 Dimensions 107 460 172 8 158 7 31 30 25 82 3 14 192 8 97 8 30 30 129 Fig 6 8 Dimensions of mounting plate in mm 612 278 625...

Страница 32: ...a in compli ance with the currently applicable installation standards The investigations have shown that no dangers arise if the inverter is operated in combination with an upstream residual current d...

Страница 33: ...hus set separately for DC 1 and DC 2 For this reason the module strings on DC 1 and DC 2 can have different alignments or dimensioning A classic application exam ple is a building with a gable roof on...

Страница 34: ...puts illustration of princi ple For currents and voltages refer to 14 Technical data page 162 6 8 2 Separate and parallel connected DC inputs The inverter can be used with separately or parallel conne...

Страница 35: ...x Fig 6 14 Parallel connected DC inputs The module strings are brought together in a distribution box and then the DC cables are connected to DC 1 and DC 2 MPP tracker 1 controls all the module string...

Страница 36: ...ecting to ungrounded solar modules When solar modules that are not grounded are used the DC inputs can be connected separately or in parallel 3P4W 3P3W 1 L1 2 L2 3 L3 4 N 5 PE 1 L1 2 L2 3 L3 PE Separa...

Страница 37: ...he grid and the AC terminal on the inverter After commissioning the insulation monitoring on the inverter display must be set see 9 12 Insulation mode and insulation resistance page 94 1 L1 2 L2 3 L3...

Страница 38: ...e terminals to DC The connection schemes shown in the following can also be mixed OFF ON O F F O N Fig 6 17 Connecting one string to a DC connection OFF ON 2 O F F O N 2 Fig 6 18 Connecting two string...

Страница 39: ...r Run the RS485 cable at a distance from the other cables to prevent interference to the data link Requirements for the cables Twisted and shielded cable Cable diameter 5 mm Wire cross section 1 mm2 6...

Страница 40: ...f a PC The following accessories will be required for this Accessory Description USB RS485 adapter with RS485 cable To connect a PC to the inverter Delta Service Software To change the settings on the...

Страница 41: ...C16 3 C016 20E004 800 2 Rated current 40 A Min max cable diameter 11 20 mm Min max wire cross section 2 5 6 mm2 Recommended torque for clamping screws 0 7 Nm The AC plug can only be used with flexibl...

Страница 42: ...s Part Quantity Description DC plugs 4 pairs The required number of DC plugs is supplied with the inverter Should you need a different size or a replacement order the required version using the follow...

Страница 43: ...tive caps from the DC terminals Available from Multi Contact 6 14 4 To ground the inverter housing Part Quantity Description Grounding cable with terminal lug 1 Typically a yellow green copper cable w...

Страница 44: ...abels Comply with the local regulations concerning the attachment of warning labels Do not work on this equipment until it is located from both mains and on site generation supplies WARNING Dual suppl...

Страница 45: ...ight is not shining directly on the solar modules Never disconnect the inverter from the solar modules when it is under load Turn the DC disconnector to the OFF posi tion Disconnect the connection to...

Страница 46: ...ng plate 3 Check that the inverter is hanging correctly in the mounting plate 7 3 Installing the inverter WARNING Heavy weight The inverter is very heavy The inverter must be lifted and carried by at...

Страница 47: ...7 Installation and Operating Manual for RPI M15A M20A Solar Inverter V1 0 2016 03 18 7 Installation 4 Check that the lower edge of the inverter is resting correctly against the wall or mounting system...

Страница 48: ...7 Installation Installation and Operating Manual for RPI M15A M20A Solar Inverter V1 0 2016 03 18 48 5 Fasten the inverter to the wall or mounting system...

Страница 49: ...Always ground the inverter housing before connecting the inverter to the grid and the solar modules 1 Bolt the grounding cable to the inverter M4 screw spring washer flat washer and serrated washer a...

Страница 50: ...ay M1 G2 Individual wires are connected at the inverter end an RJ45 plug is used at the Gateway end Inverter SOLIVIA Gateway M1 G2 1 8 DATA Terminal 3 or 5 Pin 7 DATA Terminal 4 or 6 Pin 6 or 8 7 5 Co...

Страница 51: ...a logger Connection diagram for several inverters If the data logger has no integrated RS485 termination resis tor then switch on the RS485 termination resistor on the first inverter After commissioni...

Страница 52: ...e gland from the communications connector and remove the gland and seal 2 Remove the cover screws and then the cover 3 Withdraw the communications card 4 Pull the cable through the cable gland and sea...

Страница 53: ...A Solar Inverter V1 0 2016 03 18 7 Installation 6 Set the DIP switch for the RS485 termination resistor to the ON position 7 Insert the communications card 8 Fit the cover and tighten the screws 9 Fit...

Страница 54: ...s and then the cover 3 Withdraw the communications card 4 Pull the cable coming from the data logger and the cable go ing to the second inverter through the gland and the seal Do not remove the rubber...

Страница 55: ...Solar Inverter V1 0 2016 03 18 7 Installation 6 Set the DIP switch for the RS485 termination resistor to the OFF position 7 Insert the communications card 8 Fit the cover and tighten the screws 9 Fit...

Страница 56: ...s and then the cover 3 Withdraw the communications card 4 Pull the cable coming from the previous inverter and the ca ble going to the next inverter through the gland and the seal Do not remove the ru...

Страница 57: ...Solar Inverter V1 0 2016 03 18 7 Installation 6 Set the DIP switch for the RS485 termination resistor to the OFF position 7 Insert the communications card 8 Fit the cover and tighten the screws 9 Fit...

Страница 58: ...er Twist off the cable gland from the com munications connector and remove the gland and seal 2 Remove the cover screws and then the cover 3 Withdraw the communications card 4 Pull the cable coming fr...

Страница 59: ...allation 5 Connect the wire for DATA to terminal 5 and the wire for DATA to terminal 6 6 Set the DIP switch for the RS485 termination resistor to the ON position 7 Insert the communications card 8 Fit...

Страница 60: ...4 Fig 7 1 Components on the communications card 1 DIP switch for RS485 termination resistor 2 RS485 terminal block 3 Dry contacts terminal block 4 External power off RJ45 7 6 2 Wiring dry contacts wi...

Страница 61: ...e communications card 4 Pull the cable through the cable gland and seal Do not remove the rubber plugs from the unused lead throughs in the seal 5 Connect the two wires to COM and N01 6 Insert the com...

Страница 62: ...3 Wiring dry contacts with an internal 12 VDC supply GND VCC DATA DATA DATA DATA COM N01 N02 RS485 Klemmenblock Potenzialfreie Kontakte Lampe Summer Fig 7 2 Dry contacts with internal 12 VDC supply f...

Страница 63: ...tion 5 Connect the wires according to one of the two variants Wiring according to Variant 1 should look like this Wiring according to Variant 2 should look like this 6 Insert the communications card 7...

Страница 64: ...rnal power off RJ45 Pin assignment Pin Designa tion Short cir cuit Assigned action 1 V1 2 K0 V1 K0 External power off EPO 3 K1 V1 K1 4 K2 V1 K2 5 K3 V1 K3 6 K4 V1 K4 7 K5 V1 K5 Reserved 8 K6 V1 K6 Res...

Страница 65: ...munications card 4 Pull the cable through the cable gland and seal Do not remove the rubber plugs from the unused lead throughs in the seal 5 Plug the cable connector into the RJ45 socket 6 Insert the...

Страница 66: ...tral conductor 3P4W 3 phases N PE If the inverter is connected to a grid without neutral conductors the AC connection type must be changed to 3P3W on the display after commissioning see 9 17 AC connec...

Страница 67: ...crimp them 4 Unscrew the nut and housing from the AC plug 5 Pull the cable through the nut and the housing NOTE Pay attention to the phase assignment when connecting the AC cable to the AC plug Incor...

Страница 68: ...cap from the AC terminal and keep it 9 Plug the AC plug into the AC terminal on the inverter and tighten 10 Secure the AC cable with a strain relief 11 If the inverter is connected to a grid without n...

Страница 69: ...the connection to the grid so that the inverter cannot supply any energy to it Disconnect the inverter from all AC and DC sources Make sure that none of the connec tions can be inadvertently re estab...

Страница 70: ...and on site generation supplies WARNING Dual supply Isolate on site Generation Unit s at _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Isolate mains supply at _ _ _ _ _ _ _...

Страница 71: ...the and buttons to select a country or grid Custom UK G59 3 240V UK G59 3 230V 21 Jun 2013 09 30 Country Setting 6 6 Country Available grids United Kingdom UK G59 3 230V UK G59 3 240V 3 Press the ENT...

Страница 72: ...Insulation mode and insulation resistance 94 9 13 Reconnection time 97 9 14 Ramp up power 99 9 15 Dry contacts 101 9 16 External power off EPO 102 9 17 AC connection type 104 9 18 Country Grid type 1...

Страница 73: ...15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and buttons select the Settings entry and pres...

Страница 74: ...0 Personal Settings 5 Use the and buttons to select a language Language Language Date Time Screen Saver Brightness Contrast Fran ais 02 12 2013 DD MM YYYY 08 53 5 min 3 2 21 Jun 2013 09 30 Personal Se...

Страница 75: ...20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and buttons select the Settings entry and press the ENT button E T...

Страница 76: ...2013 09 30 Personal Settings 5 Use the and buttons to select the value 4 Language Date Time Screen Saver Brightness Contrast English DD MM YYYY 08 53 5 min 3 21 06 2013 21 Jun 2013 09 30 Personal Set...

Страница 77: ...12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and buttons select the Settings entry and press the ENT butto...

Страница 78: ...2013 09 30 Personal Settings 5 Use the and buttons to select the value 4 Language Date Time Screen Saver Brightness Contrast English DD MM YYYY 08 53 5 min 21 06 2013 2 21 Jun 2013 09 30 Personal Sett...

Страница 79: ...e EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log D...

Страница 80: ...3 09 30 Personal Settings 5 Use the and buttons to select the value 10 min Language Date Time Screen Saver Brightness Contrast English DD MM YYYY 08 53 21 06 2013 2 3 21 Jun 2013 09 30 Personal Settin...

Страница 81: ...edly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and bu...

Страница 82: ...n Saver Brightness Contrast English DD MM YYYY 2 3 5 min 08 53 2013 06 21 21 Jun 2013 09 30 Personal Settings 6 Using the and buttons set the value and press the ENT button 12 2013 24 Language Date Ti...

Страница 83: ...and Operating Manual for RPI M15A M20A Solar Inverter V1 0 2016 03 18 9 Settings 24 12 2015 Language Date Time Screen Saver Brightness Contrast English DD MM YYYY 09 30 5 min 3 2 24 Dec 2015 09 30 Pe...

Страница 84: ...il the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and buttons se...

Страница 85: ...06 2013 2 3 08 53 5 min 21 Jun 2013 09 30 Personal Settings The minutes are highlighted 6 Using the and buttons set the value and press the ENT button Language Date Time Screen Saver Brightness Contra...

Страница 86: ...e EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log D...

Страница 87: ...ate 21 Jun 2013 09 30 Coefficients Settings 5 Use the and buttons to select the value 0 00 0 00 9600 CO2 Saved kg kWh Earning Value kWh Currency Baud rate 21 Jun 2013 09 30 Coefficients Settings 6 Pre...

Страница 88: ...ayed press the EX IT button to open the main menu Alternatively press the EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour...

Страница 89: ...e changed 001 Inverter ID Insulation RCMU Country Grid Settings Reconnection Time Ramp up Power UK G59 3 230V ON 20 S 6000 m 21 Jun 2013 09 30 Install Settings 6 Use the and buttons to select the valu...

Страница 90: ...repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the...

Страница 91: ...21 Jun 2013 09 30 Coefficients Settings 5 Use the and buttons to select the value 1 00 0 00 19200 CO2 Saved kg kWh Earning Value kWh Currency Baud rate 21 Jun 2013 09 30 Coefficients Settings 6 Press...

Страница 92: ...enu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and buttons select the Sett...

Страница 93: ...rate 21 Jun 2013 09 30 Coefficients Settings 5 Use the and buttons to select the value 0 00 0 00 19200 CO2 Saved kg kWh Earning Value kWh Currency Baud rate 21 Jun 2013 09 30 Coefficients Settings 6...

Страница 94: ...t information is displayed press the EX IT button to open the main menu Alternatively press the EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh...

Страница 95: ...ns select the Mode entry and press the ENT button 550 kohm Resistance Mode ON 21 Jun 2013 09 30 Insulation The present mode is highlighted and can be changed 550 kohm Resistance Mode ON 21 Jun 2013 09...

Страница 96: ...ulation 10 Use the and buttons to select the value 300 kohm Resistance Mode ON 21 Jun 2013 09 30 Insulation 11 Press the ENT button to confirm The insulation mode and insulation resistance are set 002...

Страница 97: ...ection time 1 If the default information is displayed press the EX IT button to open the main menu Alternatively press the EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12...

Страница 98: ...be changed 001 S m Inverter ID Insulation RCMU Country Grid Settings Reconnection Time Ramp up Power UK G59 3 230V ON 20 6000 21 Jun 2013 09 30 Install Settings 6 Use the and buttons to select the val...

Страница 99: ...ing the ramp up power 1 If the default information is displayed press the EX IT button to open the main menu Alternatively press the EX IT button repeatedly until the main menu is displayed 20 15 10 5...

Страница 100: ...changed 001 S m Inverter ID Insulation RCMU Country Grid Settings Reconnection Time Ramp up Power UK G59 3 230V ON 20 6000 21 Jun 2013 09 30 Install Settings 6 Use the and buttons to select the value...

Страница 101: ...and Operating Manual for RPI M15A M20A Solar Inverter V1 0 2016 03 18 9 Settings 9 15 Dry contacts Overview This function has no setting options Path to the menu item Main Menu Settings Install Setti...

Страница 102: ...ys 1 If the default information is displayed press the EX IT button to open the main menu Alternatively press the EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24...

Страница 103: ...nged 30 10 3P4W S m Grid err Lock EPO 2 EPO 1 Dry contact Normal Open Normal Open Ramp up Power Reconnection Time AC Connection OFF 21 Jun 2013 09 30 Install Settings 6 Use the and buttons to select a...

Страница 104: ...lt information is displayed press the EX IT button to open the main menu Alternatively press the EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh...

Страница 105: ...n 2013 09 30 Install Settings The currently set option is highlighted and can be changed 3P4W 3P4W OFF Grid err Lock AC Connection 21 Jun 2013 09 30 Install Settings 6 Use the and buttons to select an...

Страница 106: ...lternatively press the EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 20...

Страница 107: ...t of countries and grid types is displayed The cur rently set country is highlighted Custom UK G59 3 240V UK G59 3 230V 21 Jun 2013 09 30 Country Setting 6 6 6 Use the and buttons to select a country...

Страница 108: ...pen the main menu Alternatively press the EX IT button repeatedly until the main menu is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved...

Страница 109: ...be changed 001 Inverter ID Insulation RCMU Country Grid Settings Reconnection Time Ramp up Power UK G59 3 230V ON 20 S 6000 m 21 Jun 2013 09 30 Install Settings 6 Use the and buttons to select an opt...

Страница 110: ...fied trip time to allow the current to fall below the trip value again If the trip time is exceeded the inverter shuts down Calling up the menu item 1 If the default information is displayed press the...

Страница 111: ...s Setting the mode 1 Using the and buttons select the Mode entry and press the ENT button 1 00 A 0 2 s Trip value Trip time Mode ON 21 Jun 2013 09 30 DC Injection The currently set mode is highlighted...

Страница 112: ...00 A 0 2 s Trip value Trip time Mode ON 21 Jun 2013 09 30 DC Injection 2 Use the and buttons to select the value 1 50 A 0 2 s Trip value Trip time Mode ON 21 Jun 2013 09 30 DC Injection 3 Press the EN...

Страница 113: ...esetting the inverter to default settings 1 If the default information is displayed press the EX IT button to open the main menu Alternatively press the EX IT button repeatedly until the main menu is...

Страница 114: ...s The inverter will be reset to the default settings and the country list displayed The currently set country is highlighted Custom UK G59 3 240V UK G59 3 230V 21 Jun 2013 09 30 Country Setting 6 6 7...

Страница 115: ...rter V1 0 2016 03 18 9 Settings The inverter has been reset to the default settings The de fault information is displayed 20 15 10 5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hou...

Страница 116: ...range 0 100 Actual Rated Power The parameter is permanently set to Rated and cannot be changed Mode Setting range ON The function is switched on OFF The function is switched off Calling up the menu i...

Страница 117: ...ive Power 6 Using the and buttons select the Power Limit entry and press the ENT button Power Limit Power vs Frequency P V 21 Jun 2013 09 30 Active Power Control Switching the function on off 1 Using...

Страница 118: ...is highlighted and can be changed 100 Set Point Actual Rated Power Mode 100 Rated OFF 21 Jun 2013 09 30 Active Power Control 2 Use the and buttons to select the value 90 Set Point Actual Rated Power M...

Страница 119: ...Control Power vs Frequency Setting options Parameter Description Setting range Actual Rated Power The parameter is permanently set to Rated and cannot be changed Parameter Description Setting range S...

Страница 120: ...r Meter Energy Log Event Log Inverter Information Settings Operation Data 21 Jun 2013 09 30 Menu 3 Using the and buttons select the Active Reac tive Power Control entry and press the ENT button Person...

Страница 121: ...Power Start Frequency Stop Frequency Recovery Frequency Gradient Recovery Time Mode OFF Actual 21 Jun 2013 09 30 Active Power Control The currently set mode is highlighted and can be changed 40 0 50 0...

Страница 122: ...nt Recovery Time Mode ON Actual 21 Jun 2013 09 30 Active Power Control 2 Use the and buttons to select the value 40 0 50 05 50 30 Actual Rated Power Start Frequency Stop Frequency Recovery Frequency G...

Страница 123: ...cap 0 80 cap 0 99 Mode Setting range ON The function is switched on OFF The function is switched off Calling up the menu item 1 If the default information is displayed press the EX IT button to open...

Страница 124: ...ess the ENT button to confirm a digit 3 3 3 3 ENT 21 Jun 2013 09 30 Password 5 Using the and buttons select the Reactive Power Control entry and press the ENT button Active Power Control Reactive Powe...

Страница 125: ...F 21 Jun 2013 09 30 Reactive Power Control 2 Using the and buttons select a mode and press the ENT button cos 1 00 Mode ON 21 Jun 2013 09 30 Reactive Power Control The mode is set cos 1 00 Mode ON 21...

Страница 126: ...ive Power Control 3 Press the ENT button to confirm The parameter is set cos 0 90 Mode OFF 21 Jun 2013 09 30 Reactive Power Control Finalising the setting 1 Press the EX IT button to finalise the sett...

Страница 127: ...Upper limit cos Upper limit of cos Setting range ind 0 80 ind 0 99 1 00 cap 0 80 cap 0 99 Lower Power Lower power limit as a percentage of the rated power Setting range 0 100 Lower limit cos Lower lim...

Страница 128: ...received from Delta customer service Use the and buttons to set the individual digits Press the ENT button to confirm a digit 3 3 3 3 ENT 21 Jun 2013 09 30 Password 5 Using the and buttons select the...

Страница 129: ...ll parameters 1 Using the and buttons select a parameter and press the ENT button 100 50 Ind 0 90 100 100 V Lower Power Upper Power Lock in voltage U er li it cos ower li it cos 21 Jun 2013 09 30 Reac...

Страница 130: ...ower Lock in voltage U er li it cos ower li it cos 21 Jun 2013 09 30 Reactive Power Control Finalising the setting 1 Press the EX IT button to finalise the setting When the function is switched on a c...

Страница 131: ...escription Setting range Reactive Power Q Sn Reactive power as a percentage of the apparent power 0 ind 1 ind 63 kap 1 kap 63 Mode Setting range ON The function is switched on OFF The function is swit...

Страница 132: ...30 Active Reactive Power 6 Using the and buttons select the Constant Reac tive Power entry and press the ENT button Q U Constant cos Constant Reactive Power cos P 21 Jun 2013 09 30 Reactive Power Con...

Страница 133: ...is highlighted and can be changed 0 Mode Reactive Power Q Sn OFF 21 Jun 2013 09 30 Reactive Power Control 2 Use the and buttons to select the value 10 Mode Reactive Power Q Sn OFF 21 Jun 2013 09 30 Re...

Страница 134: ...n Qs Limit Case 2 Grid voltage Nominal voltage If the grid voltage falls below the upper voltage limit V1i the inverter starts to supply capacitive reactive power If the Delay Time is greater than 0 t...

Страница 135: ...Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and buttons select the Settings entry and press the ENT button E Today Power Meter Energy Log Event Log Inver...

Страница 136: ...set mode is highlighted and can be changed s 10 00 Lock in Power Delay Time Mode Lock out Power OFF 21 Jun 2013 09 30 Reactive Power Control 2 Using the and buttons select a mode and press the ENT bu...

Страница 137: ...limit 230 0 184 0 V V V2i V1i Qi limit 231 0 Ind 44 Cap 44 21 Jun 2013 09 30 Reactive Power Control 3 Press the ENT button to confirm The parameter is set 253 0 V V V2s V1s Qs limit 230 0 184 0 V V V2...

Страница 138: ...tings FRT Setting options Vdrop U1 Dead band Vl Dead band Vh 100 t0 t1 t3 t2 Time Stay connected Disconnect from grid Ugrid Un Fig 9 2 Operating behaviour for FRT Fault Ride Through to The time at whi...

Страница 139: ...press the ENT button E Today Power Meter Energy Log Event Log Inverter Information Settings Operation Data 21 Jun 2013 09 30 Menu 3 Using the and buttons select the FRT entry and press the ENT button...

Страница 140: ...30 Reactive Power Control Changing settings The procedure is identical for all parameters 1 Using the and buttons select a parameter and press the ENT button 10 10 2 0 Dead band Vl Dead band Vh K fact...

Страница 141: ...confirm The parameter is set 15 10 2 0 Dead band Vl Dead band Vh K factor 0 Vdrop 0 2 20 3 00 s s U1 t1 t2 21 Jun 2013 09 30 FRT 1 2 Finalising the setting 1 Press the EX IT button to finalise the se...

Страница 142: ...r the most important AC and DC parameters Energy Log Energy generated sorted by day month and year Event Log A list of the last 30 error messages and their frequency Inverter Information General infor...

Страница 143: ...2 Using the and buttons select the Power Meter entry and press the ENT button E Today Power Meter Energy Log Event Log Inverter Information Settings Operation Data 21 Jun 2013 09 30 Menu Displayed inf...

Страница 144: ...kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and buttons select the Energy Log entry and press the ENT button E Today Power Meter E...

Страница 145: ...nth CO2 Saved Exit Day 21 Jun 2013 09 30 Energy Log Month To scroll between the months press the and but tons Press the ENT button to display the next page Page 4 Daily statistics 20 15 10 5 0 4 8 12...

Страница 146: ...5 0 4 8 12 16 20 24 kW 2013 06 21 kWh kWh kg 2013 06 21 Hour Peak Hours E Day Day CO2 Saved Exit Year 21 Jun 2013 09 30 Energy Log Day 2 Using the and buttons select the Event Log entry and press the...

Страница 147: ...t Log Inverter Information Settings Operation Data 21 Jun 2013 09 30 Menu Displayed information Press the and buttons to scroll Press the EX IT button to exit the menu 01414A00434 2 24 1 60 2 36 001 S...

Страница 148: ...rter The solar modules start to produce current as soon as light falls on them This occurs even if the light is not shining directly on the solar modules Never disconnect the inverter from the solar m...

Страница 149: ...ncorrect country or grid setting Check the country and grid settings Incorrect wiring in the AC plug Check the wiring of the AC plug E07 Grid Quality Non linear load on the grid and close to the inver...

Страница 150: ...ge at DC2 is below the minimum required DC input voltage Check the DC input voltage at DC2 on the inverter display The solar irradiation is possibly too low W11 HW Fan One or more fans are blocked Rem...

Страница 151: ...ult Consult Delta customer service F31 F33 F35 HW Bus OVR DC input voltage is above the maximum permis sible DC input voltage Change the solar installation setting so that the DC input voltage at DC1...

Страница 152: ...oltage Check the DC input voltage on the inverter dis play The solar irradiation is possibly too low Internal fault Consult Delta customer service F50 HW ZC Fail Internal fault Consult Delta customer...

Страница 153: ...y on the solar modules Never disconnect the inverter from the solar modules when it is under load Turn the DC disconnector to the OFF posi tion Disconnect the connection to the grid so that the invert...

Страница 154: ...k has been unscrewed the full weight of the block is hanging on the power sup ply cables for the two fans Support the fan block with one hand while unscrewing it NOTE Do not use any sharp pointed or h...

Страница 155: ...RPI M15A M20A Solar Inverter V1 0 2016 03 18 12 Maintenance 3 Unplug the power supply cables from the fan connections 4 Clean the fans with a compressed air cleaner or a stiff brush 5 Plug the power s...

Страница 156: ...12 Maintenance Installation and Operating Manual for RPI M15A M20A Solar Inverter V1 0 2016 03 18 156 6 Insert the fan block and screw it on...

Страница 157: ...2 Maintenance 12 3 Cleaning air outlets NOTE Do not use any sharp pointed or hard objects for cleaning 1 Unscrew and remove the covers of the air outlets on both sides 2 Clean the filters with a compr...

Страница 158: ...s on them This occurs even if the light is not shining directly on the solar modules Never disconnect the inverter from the solar modules when it is under load Turn the DC disconnector to the OFF posi...

Страница 159: ...ose the DC terminals with the sealing caps Removing the communications cable 9 Twist off the cable gland from the communications connector and withdraw the gland and seal 10 Remove the cover screws an...

Страница 160: ...0 2016 03 18 160 13 Fit the cover and tighten the screws 14 Insert the grommets in the seal 15 Fit the seal and cable gland and tighten the cable gland Removing the grounding cable 16 Unscrew the gro...

Страница 161: ...r from the wall or the mounting system on both sides 19 Lift the inverter out of the mounting plate 20 Place the inverter in its original box 21 To store the inverter pack all the parts that were deli...

Страница 162: ...a failure 24 A 12 A per string Maximum input current total DC1 DC2 44 A 22 A 22 A 44 A 22 A 22 A Number of MPP trackers Parallel inputs 1 MPP tracker separate inputs 2 MPP trackers Number of DC inputs...

Страница 163: ...4 EU efficiency 97 9 98 1 Operating temperature range 25 60 C Operating temperature range without limiting 25 40 C 25 47 C 5 Storage temperature range 25 60 C Relative humidity 0 100 non condensing Ma...

Страница 164: ...srael supporto israel solar inverter com 800 787 920 toll free Italy supporto italia solar inverter com 800 787 920 toll free Netherlands ondersteuning nederland solar inverter com 0800 022 1104 toll...

Отзывы: