Steps
1.
Make sure that the power switches are in the OFF position before connecting the power cables.
2.
Connect the power cables to both power supply/cooling fan modules in the storage system chassis
and secure the power cables firmly to the brackets using the straps provided.
Figure 81. Connect the Power Cables
3.
Plug the other end of the power cables into a grounded electrical outlet or a separate power source
such as an uninterrupted power supply (UPS) or a power distribution unit (PDU).
4.
Press both power switches on the rear of the storage system chassis to turn on the storage system.
Figure 82. Turn On the Storage System
When the SC4020 storage system is powered on, a delay occurs while the storage system prepares
to start up. During the first minute, the only indication that the storage system is powered on are the
LEDs on the storage controllers. After the 1-minute delay, the fans and LEDs turn on to indicate that
the storage controllers are starting up.
NOTE: If the LEDs on a storage controller do not turn on, the storage controller may not be
fully seated in the storage system chassis. If this issue occurs, press both power buttons to turn
off the storage system, reseat the storage controller, and press both power buttons again to
turn on the storage system.
5.
Wait until the green diagnostic LEDs on the back of each storage controller match the pattern shown
in the following figure. This LED pattern indicates that a storage controller has started up
successfully.
NOTE: It could take up to 5 minutes for a storage controller to completely start up.
Set up Storage Center Software
99
Содержание SC4020
Страница 1: ...Dell Storage Center SC4020 Storage System Deployment Guide ...
Страница 170: ...170 Adding or Removing an Expansion Enclosure ...
Страница 178: ...178 HBA Server Settings ...
Страница 182: ...182 iSCSI Settings ...