![Dell SC4020 Скачать руководство пользователя страница 142](http://html.mh-extra.com/html/dell/sc4020/sc4020_deployment-manual_79827142.webp)
Test Storage Controller Failover
Test the Storage Center to make sure that a storage controller failover does not interrupt I/O.
About this task
CAUTION: When testing storage controller failover, do not restart a storage controller by pulling
it out and reseating it. Instead, restart the storage controller using Dell Storage Manager Client.
NOTE: Before restarting a storage controller in this task, put the storage controller into maintenance
mode. This mode suppresses alerts that may generate due to the storage controller restart.
Steps
1.
Connect to a server, create a Test folder on the server, and copy at least 2 GB of data into it.
2.
Restart the top storage controller while copying data to a test volume to verify that the storage
controller failover event does not interrupt I/O.
a. Copy the Test folder to the TestVol1 volume.
b. During the copy process, restart the top storage controller (the storage controller through which
TestVol1 is mapped) by selecting it from the
Hardware
tab and clicking
Shutdown/Restart
Controller
.
c. Verify that the copy process continues while the storage controller restarts.
d. Wait several minutes and verify that the storage controller has finished restarting.
3.
Restart the bottom storage controller while copying data to a test volume to verify that the storage
controller failover event does not interrupt I/O.
a. Copy the Test folder to the TestVol2 volume.
b. During the copy process, restart the bottom storage controller (through which TestVol2 is
mapped) by selecting it from the
Hardware
tab and clicking
Shutdown/Restart Controller
.
c. Verify that the copy process continues while the storage controller restarts.
d. Wait several minutes and verify that the storage controller has finished restarting.
Test MPIO
Perform the following tests for a Storage Center with Fibre Channel or iSCSI front-end connectivity if the
network environment and servers are configured for MPIO. Always perform the following tests for a
Storage Center with front-end SAS connectivity.
1.
Create a Test folder on the server and copy at least 2 GB of data into it.
2.
Make sure that the server is configured to use load balancing MPIO (round-robin).
3.
Manually disconnect a path while copying data to TestVol1 to verify that MPIO is functioning
correctly.
a. Copy the Test folder to the TestVol1 volume.
b. During the copy process, disconnect one of the I/O paths and verify that the copy process
continues.
c. Reconnect the path.
4.
Repeat the previous steps as necessary to test additional paths.
5.
Restart the storage controller that contains the active path while I/O is being transferred and verify
that the I/O process continues.
6.
If the front-end connectivity of the Storage Center is Fibre Channel or iSCSI and the Storage Center
is not in a production environment, restart the switch that contains the active path while I/O is being
transferred, and verify that the I/O process continues.
142
Perform Post-Setup Tasks
Содержание SC4020
Страница 1: ...Dell Storage Center SC4020 Storage System Deployment Guide ...
Страница 170: ...170 Adding or Removing an Expansion Enclosure ...
Страница 178: ...178 HBA Server Settings ...
Страница 182: ...182 iSCSI Settings ...