![DELAIR UX5 HP Скачать руководство пользователя страница 71](http://html1.mh-extra.com/html/delair/ux5-hp/ux5-hp_user-manual_2465784071.webp)
l
Check the landing surface and obstacle clearances to make sure the most suitable landing type is
selected.
For more information, see
.
2. Repeat step 1 for each location that you consider as an alternative landing location.
Note –
If you choose to check alternative landing locations during flight, be aware that this takes
more time and keeps your attention from the flight.
3. Tap the
Flight
tab
and make any changes to the flights, if required. For more information, see
4. Make sure that the selected takeoff location is fixed to GPS. To fix the location, physically go to the
location, tap
and then tap
in the toolbar.
5. Make sure that the selected landing location is fixed to GPS. To fix the location, physically go to the
location, tap
and then tap
in the toolbar. Repeat for each landing location that you consider as
an alternative location.
Note –
If you choose to check alternative landing locations during flight, be aware that this takes
more time and keeps your attention from the flight.
6. In the
Flights
screen, select the flight you will complete and then tap the
Flight checklist
tab.
Completing the flight checklist
The
Flight checklist
tab
starts with an overview of the flight that you have selected and will execute.
Note –
More information about the steps that require special care is given in the following sections. Read
these sections carefully until you are familiar with all of the tasks required to perform these steps.
Use each step of the
Flight checklist
tab
to prepare the equipment for flight. The flight checklist guides
you through each step.
l
Selecting the operating mode, page 72
l
Configuring the operation mode settings, page 72
l
l
Connecting the battery, page 72
l
Checking the rover and sensor type, page 73
l
Checking the gBox status, page 73
l
Entering the serial number of the lens, page 73
l
l
l
Checking the camera trigger and shutter feedback, page 74
l
Inserting the tracker transmitter, page 74
l
Closing the payload bay, page 74
l
Covering the pitot tube, page 74
l
Checking the elevon trim, page 75
l
Checking the elevon response, page 75
l
Assembling the launcher, page 75
71
Delair-Tech
|
676, Rue Max Planck – 31670 Toulouse-Labège, France
|
Tel: +33 (0) 5 82 95 44 06
|
Capital: 238 110,30 € - APE: 3030Z – Intra-Community VAT number: FR90 53 09 69 781 – 530 969 781 R.C.S. Toulouse
This document is the sole property of Delair-Tech and cannot be used or reproduced without the written authorization of Delair-Tech
.