AP Blot - SERVICE MANUAL
SECTION 3
MAINTENANCE PROCEDURES
Doc. N° MDS-AP-26-00-02
Rev.01
Date: 02.04.2009
Page 48
3.5.4.4.
Substituting Z
2
Axis probe motor
a) Remove Z
1
protective carter after undoing two fixing screws
b)
Remove motor connector from INTEROP2 PCB and remove cable holder bands
c)
Remove fixing screws and change motor
d)
Reconnect motor to PCB and replace cable holder bands
e)
Check that Z2 axis movement is smooth.
f)
Check Z1 movements and steps.
g)
Check X-Y centering as described in para. 3.4.3.1.
2 fixing
screws
Motor fixing
screws