48
|
Dali Matrix PS System Installation and Commissioning Guide
Dali Wireless Proprietary and Confidential | DW-MAN-036 Rev 06
3.2.1
Installing Cable Management Trays
Install horizontal cable management trays and vertical cable management channels to
manage base station feed, optical fiber, power, and Ethernet cabling.
Figure 3-3: Installed Cable Management Trays
3.3
Grounding the hdHost PS
Before grounding the hdHost PS:
Ensure the rack is grounded to the main facility ground
Ensure the rack has a ground bar bus installed