Matrix PS System Installation and Commissioning Guide
|
175
Dali Wireless Proprietary and Confidential | DW-MAN-036 Rev 06
1 5
D L AN D U L G AI N
CO NF I G U R AT I O N
This chapter describes how to:
Understand the process for setting DL and UL gain
Activate the RF signal path
Configure the downlink path
Configure the uplink path
15.1
Gain Commissioning Process
The process for setting the gain is to activate the RF signal path one band at a time,
and then add attenuation where necessary to adjust and balance DL and UL gain.
For each band, turn on the RF signal path first in the host followed by the remote. After
each band is activated, check for alarms and expected signal levels on the power
meters.
The steps in this chapter should be performed in conjunction with the operator and on-
site base station personnel.
15.2
Activating the RF Signal Path
Before activating the RF signal path, address all major and critical alarms. The system tree
should show only green or orange alarm indicators.
To activate the RF signal path for each frequency band:
1. Select a host or remote in the system tree and click
to display the Band
Information view.