Dali Matrix PS System Installation and Commissioning Guide
Dali Wireless Proprietary and Confidential | DW-MAN-036 Rev 06
2.2
Documentation Requirements
In addition to this Installation and Commissioning Guide, the following site-specific
documents are recommended. These documents are created by Matrix-certified RF
designers and system integrators.
System design & RF plan describing detailed installation prerequisites and the
logical layout of optical fiber
Fiber plan describing the labelling of fiber runs, installation of optical fiber, and
physical routing of optical fiber
Rack layout plan describing the layout and interconnection of rack mounted
units
Clock distribution plan describing the master clock sources used for optical
clock synchronization
Network design plan for IP planning, VPN planning, and NMS integration
Gain lineup spreadsheet containing base station gain settings
2.3
System Level Requirements
2.3.1
Safety Warnings
Before installing and commissioning components of the Matrix PS system, there are a
number of important preparation tasks that will ensure the process goes safely and
smoothly.
Make sure you:
Heed all safety and electrical warnings, especially when working with electricity
and electrical equipment.
Follow any applicable regulations and Matrix PS system recommendations for
equipment rack specifications, placement, and layout.
Ensure the Matrix units come with all components and mounting hardware out
of the box.
Ensure you have all the required tools and the adequate number of trained
personnel on hand before commencing.