248
GB
3.
Replace the used batteries.
WARNING: do not mix batteries with different charge levels
(e.g. new batteries with depleted batteries). Not respecting the
above warning can cause an explosion, escape of electrolyte,
a pollutant gas emission or other dangerous consequences for
persons or property.
CAUTION
• Remove ALL the BATTERIES before replacing them by the new
ones.
• If this procedure is not observed, continuing to see a weak
battery the module will not be re-initialized and low battery LED
will continue to be indicated.
4.
Close the back boxes of the modules
5.
Open the front covers and carry out a functional test (see
chapter
“6. Functional installation test”
)
6.
Return the control panel to user mode by entering:
installer code
A.
Insert the battery in its housing in the direction indicated in
the diagram.
B.
Press firmly on the battery to establish good contact.
Upon reconnecting of power, only the receiver and transmitter
modules
with
built-in
radio
transmitters carry out an autotest.
If the auto test is:
• correct, the LED lights for 2 seconds,
• incorrect, the LED flashes for 5 seconds.
SH
102A
X
A1
131A05789
Battery contacts
LED
Push button
Battery
End-of-Line
terminator
(installed only to
the top module
of the column)
ATTENTION: to identify the products (SH102AX or SH103AX)
fitted with radio transmitters:
• consult the reference registered on the label product located
on the back case,
• only the push-button, of the receiver and transmitter modules
fitted with radio, once powered, is active.
Содержание SH101AX
Страница 1: ...Upgraded for e Nova applications...
Страница 42: ...252 GB Dimensions 164 5 mm 217 07 mm 239 mm 88 mm 83 5 mm...
Страница 44: ...254 GB...
Страница 45: ...255 GB...
Страница 46: ...256 GB...
Страница 47: ...257 GB...
Страница 48: ...258 GB...
Страница 49: ...259 GB...
Страница 50: ...805184 B 07 2013...