17
|
Unit installation
Installer and user reference guide
89
RYMA5+RXYA8~20A7Y1B
VRV 5 heat pump
4P749918-1 – 2023.12
729
≤613
≥929
≥
AB
AA
a
(mm)
Minimum foundation
a
Anchor point (4×)
HP
AA
AB
5~12
766
992
14~20
1076
1302
▪
Fasten the unit in place using four foundation bolts M12. It is best to screw in the
foundation bolts until their length remains 20 mm above the foundation surface.
20 mm
NOTICE
▪
Prepare a water drainage channel around the foundation to drain waste water
from around the unit. During heating operation and when the outdoor
temperatures are negative, the drained water from the outdoor unit will freeze
up. If the water drainage is not taken care of, the area around the unit might be
very slippery.
▪
When installed in a corrosive environment, use a nut with plastic washer (a) to
protect the nut tightening part from rust.
a
17.3.2 To install the outdoor unit
1
Transport the unit by crane or forklift and put it onto the installation
structure.
2
Fix the unit to the installation structure.
3
If transported by crane, remove the slings.
Содержание VRV 5 RXYA8A7Y1B
Страница 197: ......
Страница 198: ......
Страница 199: ......
Страница 200: ...4P749918 1 2023 12 Copyright 2023 Daikin Verantwortung f r Energie und Umwelt...