18.3.6 To insulate the refrigerant piping
After finishing the leak test and vacuum drying, the piping must be insulated. Take
into account the following points:
▪
Make sure to insulate the connection piping and refrigerant branch kits entirely.
▪
Be sure to insulate the liquid and gas piping (for all units).
▪
Use heat resistant polyethylene foam which can withstand a temperature of 70°C
for liquid piping and polyethylene foam which can withstand a temperature of
120°C for gas piping.
▪
Reinforce the insulation on the refrigerant piping according to the installation
environment.
Ambient temperature
Humidity
Minimum thickness
≤30°C
75% to 80% RH
15 mm
>30°C
≥80% RH
20 mm
Between outdoor and indoor unit
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
1
Insulate and fix the refrigerant piping and cables as follows:
d
b
e
a
d
a
c
f
a
Liquid piping
b
Gas piping
c
Equalising piping
d
Finishing tape
e
Interconnection cable (F1/F2)
f
Insulation
2
Install the service cover.
Inside the outdoor unit
To insulate the refrigerant piping, proceed as follows:
b
a
c
d
a
Sealant
b
Insulation
c
Vinyl tape around curves
d
Vinyl tape against sharp edges
1
Insulate the gas, liquid, and equalising piping.