3
|
Components
Service manual
98
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
a
Fuse F1U
b
Fuse F2U
c
Fuse F3U
Blown fuse on the main PCB?
Action
Yes
Replace the blown fuse, see
No
95] of the main PCB and
continue with the next procedure.
Problem solved?
After all checking procedures listed above have been performed:
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
3.9.2 Repair procedures
To correct the wiring from the main power supply terminal to the main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
111].
2
Make sure that all wires are firmly and correctly connected, see
151].
3
Check the continuity of all wires.
4
Replace any damaged or broken wires.
Is the problem solved?
Action
Yes
No further actions required.
No
95] of the PCB and
continue with the next procedure.
To remove the main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
111].
1
Disconnect all connectors from the main PCB.
Содержание Sky Air Advance RZA200D7Y1B
Страница 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Страница 190: ......
Страница 191: ......
Страница 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...