3
|
Components
Service manual
95
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
10
Add
refrigerant
to
the
refrigerant
circuit,
see
142].
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
3.9 Main PCB
3.9.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a power check of the main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
2
Turn ON the power of the unit.
3
Measure the voltage between pin 1‑3 on connector X801A on the main PCB.
Result:
The measured voltage MUST be 230 V AC ± 10%.
a
a
Connector X801A
Is the measured voltage on the PCB
correct?
Action
Yes
Return to
continue with the next procedure.
No
Continue with the next step.
4
Check the power supply to the unit, see
135].
Содержание Sky Air Advance RZA200D7Y1B
Страница 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Страница 190: ......
Страница 191: ......
Страница 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...