3
|
Components
Service manual
102
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
a
b
c
d
a
L1A
b
L2A
c
L3A
d
N
Is the measured voltage on the PCB
correct?
Action
Yes
continue with the next procedure.
No
Continue with the next step.
5
Check the power supply to the unit, see
Does the unit receive power?
Action
Yes
Correct the wiring from the main power
supply terminal to the noise filter PCB,
see
No
Adjust the power supply to the unit, see
137].
To perform an electrical check of the noise filter PCB
Prerequisite:
First check the power supply to the noise filter PCB, see
1
Measure the voltage between output wires L1B‑L2B‑L3B on the noise filter
PCB.
Result:
All measurements MUST be 400 V AC ± 10%.
Содержание Sky Air Advance RZA200D7Y1B
Страница 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Страница 190: ......
Страница 191: ......
Страница 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...