3
|
Components
Service manual
55
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
3
Wrap a wet rag around the 4‑way valve and solder the 4‑way valve pipes to
the 4‑way valve.
CAUTION
Overheating the valve will damage or destroy it.
4
After soldering is done, stop the nitrogen supply after the component has
cooled‑down.
a
b
a
a
4‑way valve pipe
b
4‑way valve
5
Install the putty (if available) and the insulation (if available) in their original
location.
6
Install the 4‑way valve coil on the 4‑way valve body, see
7
Add
refrigerant
to
the
refrigerant
circuit,
see
142].
To install the 4-way valve coil
1
Install the 4‑way valve coil on the 4‑way valve body.
a b
c
a
Screw
b
4‑way valve coil
Содержание Sky Air Advance RZA200D7Y1B
Страница 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Страница 190: ......
Страница 191: ......
Страница 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...