3
|
Components
Service manual
133
RXM20~71R + ARXM25~71R + FTXM20~71R + ATXM25~50R +
FVXM25~50A
Split New Perfera R32
ESIE20-11 – 2021.01
1
Turn ON the power of the unit.
2
Measure the voltage between the black and white wires.
Result:
The measured voltage MUST be 230 V AC.
a
b
a
Black wire
b
White wire
Is the measured voltage on the PCB
correct?
Action
Yes
Return to
132] of the PCB and
continue with the next procedure.
No
Continue with the next step.
3
Check the power supply to the unit, see
202].
Does the unit receive power?
Action
Yes
Replace the main PCB, see
138].
No
Adjust the power supply to the unit, see
To check the HAP LED of the main PCB
Prerequisite:
First check the power supply to the main PCB, see
132].
1
Locate the HAP LED on the main PCB.
a
a
HAP LED
Содержание Perfera RXM R Series
Страница 1: ...Service manual Split New Perfera R32 RXM20 71R ARXM25 71R FTXM20 71R ATXM25 50R FVXM25 50A...
Страница 254: ......
Страница 255: ......
Страница 256: ...ESIE20 11 2021 01 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...